1 / 7

RAPAT SNIS KE-3

RAPAT SNIS KE-3. 4 MARET 2017. Anggota panitia dari Mahasiswa. Ketua Pelaksana : Lovely Lady Wakil Ketua : Pak Wahyu Call Paper : Pak Akbar, Dhana Alianissa , Alianur Sekretaris : Bu Lintang , Riza Andrika Sekretariat : Bu Kulsum, Tania Anggi , Sa f ira Aulia ,

Download Presentation

RAPAT SNIS KE-3

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RAPAT SNIS KE-3 4 MARET 2017

  2. Anggota panitia dari Mahasiswa • Ketua Pelaksana : Lovely Lady • Wakil Ketua : Pak Wahyu • Call Paper : Pak Akbar, DhanaAlianissa, Alianur • Sekretaris : Bu Lintang , Riza Andrika • Sekretariat : Bu Kulsum, TaniaAnggi, SafiraAulia, • Bendahara : Bu Evi, Bu Ani, • Seksi Acara : Bu Nurul, Bu Ade, Pak Hadi, Bagus, Amel • Seksi Publikasi/dokumentasi : Bu Nuraida, Bu Erry, Dinda Rizky PF, Akmal, • Sponsorship : Pak Asep, Bu Putiri, Alifa, Tania, RizkyAkmal, DhiarPermana • Seksi Akomodasi dan Perlengkapan : Pak Putro, Ade Fahrudin.RizkyAzaning, EkoPrasetyo, • Seksi transportasi : Pak Irman, Ilham, MaulanaBagus,AnshorFirdaus • Seksi Konsumsi : Bu Ratna, Bu Maria

  3. Brosur dan leaflet • Tim Pengarah ? Pak Danu, Pak Fatah, Pak Ahmad Ali Alhamidi • Reviewer : Prof Moses L Singgih, Prof Yuri, Prof Rahman, Dr. Asep, Dr. Wahyu, Dr. Lady, Dr. Maria • Finalisasi poster  minggu depan cetak,jumlah  120 biaya cetak = 120 x 10.000 = 1.200.000 • Tanggal Penting : Tanggalpengumumanpenerimaan full paper : 11 Agustus Batas early bird 21 Agustus Batas bayarreguler : 29 Agustus • Rencana penyebaran poster  bu kulsum, lintang • Surat • WA • Email • Event : seminar Pak Wahyu (18 Mei Semarang), Bu Nur (22 April), Pak Asep (20 Apr Sumatra,22 Apr UnivPertamina), P putro (BKSTI, 20 April).

  4. - Informasi di poster  disediakan penjemputan (*catt) • Informasi tambahan di web  Bu Nur • Cara pengiriman makalah by email : admin.snis@untirta.ac.id • Pendaftaran  isi form registrasi • Lokasi : • Cara menuju lokasi dari bandara  Damri + taksi • Jarak lokasi dari pool damri • Tempat acara dan petanya • Hotel lain yang diusulkanbesertajarakdari Aston  Pak akbar.

  5. Sponsorship • Kesiapan proposal 90%, minggu depan diperbanyak  Lady • Bentuk imbal jasa : pencantuman nama di spanduk, membuat boots, nama di umbul-umbul. • Tawaran membuat boots untuk produk kreatif ???? : • Memastikanizinmembuat boots, maksjumlah boots, adakah charge ke hotel  B Ratna( • Membayar panjar ke Aston ( maks 13 April)  B Ratna • Target penyebaran tahap pertama : - Perusahaan yang membina indusri kecil - Daftar Industri .... - No Rek 0527544169 an EviFebianti

  6. Rencana penyebaran proposalminggu depan • PT KBS Bu ..... • PT KS  Pak .... • PT Indonesia Power • Krakatau Engineering • KDL • KIEC • Alumni

  7. ACARA • Boots Pameran • PembacaanAlquran. • Pantun (di awal, tengah, akhir) • Opening Dance : TarianTradisionaldari himpunan  Bu Nurul + B Ade • Band himpunansaatmakansiang B Nurul, B Ade • Doorprize : Pendaftarpertama, penyajiterbaik, paper terbaik, instansiterbanyakmengirim. • Profiljurusandalambentukvideo B Nurul • Film dokumenterindustrikreatifBanten + narasiindustrikreatif. B Nurul

More Related