An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NPP CrIS SDR Product Chronology FuzhognWeng, SDR Chair

  2. Major CalVal Activities and Events since CrIS Powered up (in time order) • EOC activities and initial data assessment, January 18 to 31 • Instrument activation and optimization • On Jan. 20, teamstarted receiving GRAVITE IDPS science RDR data; but no valid SDR product • Data quality and instrument performance assessment • UW/UMBC CCAST first radiance images and spectra indicated that the problem causing invalid IDPS SDR data was in the IDPS processing software (Jan. 25) • Team daily team tag-up meetings: Exelis EOC activity briefing and issue discussions • Weekly telecon meetings: 6 presentations on in-orbit RDR data quality assessments • Engineering packet v32 uploaded on Jan. 31

  3. Major CalVal Activities and Events (Cont.) • Code bug fix, data assessment and CalVal data preparation, February 1 to 29 • Instrument activation and optimization (ended on Feb. 10) • SDR code bugs (2 geolocation and 1 ICT temperature bugs) were found and fixed in ADL; code patches #1 and #2 were sent to the team and Raytheon on Feb. 1 • Code problems in FCE detection/correction module were detected; code patch #4 to turn off FCE detection/correction was sent to the team and Raytheon on Feb. 6 • The problem of incorrectly handling the EngPk order in the ADL code was found and fixed on Feb. 18. The fix is crucial to the CalVal work. • On Feb. 20, AERB approved patches #1 - #4 • The team completed inter-comparisons between G-ADA and ADLs on Feb. 22 and decided to use ADL and G-ADA SDRs in the CalVal work in the absence of IDPS SDRs • On Feb. 22 & Feb 23, collected about 21 hours of full spectral resolution RDR data • On Feb. 28, the team generated G-ADA CrIS SDRs for Feb. 24, 25 & 26 as golden days • Daily tag-up meetings and weekly telecon meetings: 24 presentations

  4. Major CalVal Activities and Events (Cont.) • Calibration coefficient refinement and CalVal activities, March 1 to April 3 • Refinement and validation of non-linearity coefficients (a2s), ILS parameters and ICT emissivity table • Team reached consensus on the set of values on March 27 • The new a2s, LW and MW ILS parameters and ICT emissivity are included in Engineering packet v33, ready for upload • FOR-to-FOR striping problem and its fix • The wavenumber and scene dependent striping was reported to the team on March 14 • By March 28, the root cause was discovered and solution to fix the problem was proposed and tested • RDR/SDR data assessment and analysis • Data assessment revealing a number of data issues • Inter-satellite comparisons and RTM vs observation comparisons, • ICT model analysis • G-ADA/ADL and IDPS test data comparisons • March 24 spacecraft anomaly impact assessment • On April 2, IDPS Mx5.3 became operational • Weekly telecon meetings: 27 Presentations

  5. SDR Product: current status and schedule for Beta, Provisional and Validated SDR • Status • IDPS started producing CrIS SDRs on April 2 (Mx-5.3 build) • The results shown in this review meeting are valid to the Mx-5.3 product • EngPk v33 and the new FIR digital filter will significantly improve SDR accuracy • Code issues: FCE detection and correction module is turned off; data quality flag values are incorrectly set in some cases • Beta product • Mx-5.3 SDRs, being reviewed in this meeting • Provisional product • Review date: 7/15/2012 • IDPS date: 9/3/2012 • Validated product • Review date: 11/1/2012 • IDPS date: 12/17/2012 • Engineering packet version 34 • Team review date: TBD