An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LAL Site Report Michel Jouvin LAL / IN2P3 jouvin@lal.in2p3.fr

  2. 100 Go FC FC HDS 9570 4 TB ESA12000 1,5 TB Electronic CAD (20 Sun CPUs) Alpha Experiments (8 CPUs) Linux Experiments (40 CPUs) GRID Fram (40 CPUs) Mac (100) Xterm PC (300) Main Resources DS20 LSF Cluster • NFS • SMB • Appletalk • www • Mail • Print DS20e Gb Ethernet 100 Mb 10 Mb LAL Site Report - HEPix - BNL 2004

  3. Main Resources Changes • More Linux CPUs • 25 dual Opteron 2,2 installed (IBM e325, 1U) • Linux upgrade to Scientific Linux • Currently installed on all new machines (i386 or amd64) • Proposed on desktop, preconfigured with Kickstart • Network : new switch with 10 Gbs uplink • XtremNetworks Summit 400 (48 Gb ports) • Used by Opteron farm • Plan to replace central switch (Cabletron SSR 8000) next year LAL Site Report - HEPix - BNL 2004

  4. Mail Service • Authenticated SMTP in production • Required to relay through LAL mailer (roaming users, home access…) • Based on Sendmail + SASL • Password management integrated in npasswd used for NIS passwords • LAL extensions to npasswd • Spam : Bayesian filtering useful • Filtering efficiency : ~95% • Slow learning curve for this filter (~3 months) • Need to feed filter db with undetected SPAM once a month at least • New patterns appear on a regular basis • Undetected SPAM collection need to be automated ? • Plan to move to Cyrus v2 • SIEVE for filtering at message delivery (server based) LAL Site Report - HEPix - BNL 2004

  5. Windows Infrastructure… • IN2P3 forest in production • 11 labs in production • All IN2P3 labs should participate • No problem so far… • Move of LAL AD domain to IN2P3 forest delayed • Planned this summer but time is missing • Challenge : transparent to users, preserving GPOs • By the end of the year ? • Pressure growing as this is requirement to use national repository for mechanical CAD/CAM (CATIA SmarTeam PDF) LAL Site Report - HEPix - BNL 2004

  6. … Windows Infrastructure • SMS : key management component for LAL • Complements AD based tools • Deployment of security patches, SPs and system upgrades • SUS feature pack (presented at Edinburgh meeting) • Based on SMS inventory and logging capabilities (push model) • Plan to upgrade to SMS 2003 • Better integration of SUS features • Integration with ActiveDirectory • Virus attack caused by a problem in CISCO ACLs • Few machines affected (unpatched machines, proactive patching critical) • Checking is time consuming… LAL Site Report - HEPix - BNL 2004

  7. Printing : Multi-Site Printer Wizard • Based on CERN Printer Wizard (Windows only) • Management of LPR based printers by an unprivileged user • Printers described in a central database • Support any LPD/LPRng server • Now supports the concept of Site • Work done in common between CERN and LAL • Allow to use the same client on several sites • Each site has its own database of printers • In production at LAL since last summer • Very appreciated by our users involved in CERN experiments • Could be used/supported by other sites to help traveling users LAL Site Report - HEPix - BNL 2004

  8. GRID • Strong involvement from LAL in EDG / LCG / EGEE • LCG Tier 2 (plan to do in common with DAPNIA) • 4 FTE including PTB leader (Cal Loomis) • Still 1 additional open position to fill (2 years European contract) • Fabric : currently 40 CPU (1/3 Xeon 3Ghz, 2/3 Opteron 2.2 Ghz) • Recent machines running SL • Current focus : middleware deployment, Quattor integration • XtremWeb : a P2P computing project • Partnership with LRI (Orsay, computing research) for 4 years • Significant resources : 30 CPUs (Xeon 3 Ghz, Opteron 2.2 Ghz) • LAL interest : use of P2P resource as a fabric via OGSA LAL Site Report - HEPix - BNL 2004

  9. Miscellaneous Projects • Unattended Linux installation server • Currently based on Kickstart for initial installation • Still planning to investigate EDG WP4 Quattor • Initial installation and updates • Servers and desktops • In conjunction with EGEE involvement • Serial Console Management with SLAC/CERN tool • Presented at Hepix by C. Boeheim and H. Meinhard • Conference organization tool • InDiCo installation in progress • EU project based on CERN Agenda, presented at Edinburgh • Automatic visitor registration and DHCP quarantine LAL Site Report - HEPix - BNL 2004