1 / 7

LAL Site Report

LAL Site Report. Michel Jouvin LAL / IN2P3 jouvin@lal.in2p3.fr. Main Ressources Changes. No major change More machines and GB like everywhere… Efforts concentrated on SAN deployment Works very well Fabric redundancy not yet configured Still planning heterogeneous SAN in 2003

mei
Download Presentation

LAL Site Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LAL Site Report Michel Jouvin LAL / IN2P3 jouvin@lal.in2p3.fr

  2. Main Ressources Changes • No major change • More machines and GB like everywhere… • Efforts concentrated on SAN deployment • Works very well • Fabric redundancy not yet configured • Still planning heterogeneous SAN in 2003 • One more system engineer arrived Oct. 1st • IN2P3 national deals for some software • Vmware, Legato Networker LAL Site Report - HEPix - FNAL 2002

  3. 100 Go Compaq PWS500 Compaq DS20e 1 TB Electronic CAD (Sun + Cadence) Mechanical CAD (Alphas) Experiments Servers (Alpha, HP, Linux) Xterm Mac (100) PC (250) Main Resources DS20 • NFS • SMB • Appletalk • www • Mail • Print FC AS 800 5/500 Gb Ethernet 100 Mb 10 Mb LSF Cluster (batch + interactive) LAL Site Report - HEPix - FNAL 2002

  4. Server Software Updates • Linux 7.2 (kernel 2.4.18) completed • Started a monitoring project based on Nagios • Nagios presented by INFN at last meeting • Robust collection mechanism/infrastructure • Development of user oriented view of the ressources (Web-based) LAL Site Report - HEPix - FNAL 2002

  5. Mail Service • Still based on Sendmail + IMAP • Virus/Spam filtering project just started • Filtering based on message headers criteria rather than contents, using Sendmail milter API • More efficient than antivirus, preserve Sendmail advanced features • Most viruses can be detected by attachment types • Heuristic can be applied to detect spammers • Restrict relaying with authenticated SMTP • Upgrade IMAP server to Cyrus v2 • Interested by any experience with Cyrus v2 LAL Site Report - HEPix - FNAL 2002

  6. Windows Infrastructure • Desktops • Windows XP deployment on new laptops • Server • Replacement of old unattended installation infrastructure by W2K RIS (PXE based) • CERN PrinterWizzard in production • Works pretty well • Two main issues : • Handling of drivers for some printer types • Ability to use PrinterWizzard at LAL and at CERN LAL Site Report - HEPix - FNAL 2002

  7. Miscellanous Projects • IN2P3 ActiveDirectory forest • 1 domain per lab(10 participating) • Pilot started recently • Plan to move to production during winter • EDG/LCG • One engineer sent to CERN for LCG • G. Grosdidier : Test Group chairman • Plan to resume participation to testbed LAL Site Report - HEPix - FNAL 2002

More Related