1 / 2

Operational beams for SPS in 2001

Operational beams for SPS in 2001. Operational beams status. SFTPRO/MDSPS OK up to 1.6x10 13 LHC/TSTLHC [W28] double batch injection, acceleration & splittings: OK new: closed loop during all splitting process Extraction timing C1195/C2395 MESPS [W31]

adrian-goff
Download Presentation

Operational beams for SPS in 2001

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Operational beams for SPS in 2001 SSWG, July 3rd , 2001

  2. Operational beams status • SFTPRO/MDSPS • OK up to 1.6x1013 • LHC/TSTLHC [W28] • double batch injection, acceleration & splittings: OK • new: closed loop during all splitting process • Extraction timing C1195/C2395 • MESPS [W31] • FT 3.5GeV/c removed =>extraction timing as TSTLHC (C1195) • RF gymnastics OK (3.5ns achieved) • TSTSPS [W41?] • accelerated to 20GeV/c • start RF gymnastics soon (this week?) SSWG, July 3rd , 2001

More Related