Energy Conservation Project. Jail HVAC and Roof Replacement Project. Lee Pinkoson - Chair, Susan Baird, V-Chair, Chuck Chestnut IV, Robert Hutchinson, Mike Byerly , Sadie Darnell, County Sheriff, Betty Baker, County Manager, Dave Wagner, County Attorney. Solar Panels. ICON Water Project.

Download Presentation

Energy Conservation Project

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Energy conservation project

Energy Conservation Project

Jail HVAC and Roof Replacement Project

Lee Pinkoson - Chair, Susan Baird, V-Chair, Chuck Chestnut IV, Robert Hutchinson, Mike Byerly,

Sadie Darnell, County Sheriff, Betty Baker, County Manager, Dave Wagner, County Attorney

Solar Panels

ICON Water Project

Kitchen Remodel

Chiller Plant

92 Solar Panels

Reduced cost to heat Water

Saves over 16M gallons

of water annually

Laundry Room Upgrades

100% Energy efficient Appliances

Foam Roofing

Premium Efficient Water

Cooled Chiller Plant

State of Art Washers

and Dryers

High R-Value – Reduced AC Tonnage

  • Benefit to Citizen:

  • Reduced Utility Cost

  • Reduced Electric, Gas and Water Cost

  • Reduced GHS Emission

  • Received Over $106k in Rebates

  • Reduced Maintenance Cost

Contacts:

Director of Jail:MAJ Charles Lee [email protected]

Phone: (352) 491-4452

Project Coordinator: Bryan Schneider [email protected]

Phone: (352) 384-3190

Facilities Manager: Charlie Jackson [email protected]

Phone: (352) 374-5289.

Start Date: October 12, 2010

Completion Date: December 2013

Project Cost: $11M

A&E Firm:GRAEF – USA, Inc.

Construction Contractor: Peter Brown

Commissioning Agent:AEI

GREEN=4X GOOD

Good for the present, Good for the future, Good for the Planet, Good for the bottom line


Energy conservation project

Energy Conservation Project

Jail HVAC and Roof Replacement Project

Lee Pinkoson - Chair, Susan Baird, V-Chair, Chuck Chestnut IV, Robert Hutchinson, Mike Byerly,

Sadie Darnell, County Sheriff, Betty Baker, County Manager, Dave Wagner, County Attorney

92 Solar Panels

Reduced cost to heat Water

Saves over 16M gallons

of water annually

Laundry Room Upgrades

100% Energy efficient Appliances

Foam Roofing

Premium Efficient Water

Cooled Chiller Plant

State of Art Washers

and Dryers

High R-Value – Reduced AC Tonnage

  • Benefit to Citizen:

  • Reduced Utility Cost

  • Reduced Electric, Gas and Water Cost

  • Reduced GHS Emission

  • Received Over $106k in Rebates

  • Reduced Maintenance Cost

Contacts:

Director of Jail:MAJ Charles Lee [email protected]

Phone: (352) 491-4452

Project Coordinator: Bryan Schneider [email protected]

Phone: (352) 384-3190

Facilities Manager: Charlie Jackson [email protected]

Phone: (352) 374-5289.

Start Date: October 12, 2010

Completion Date: December 2013

Project Cost: $11M

A&E Firm:GRAEF – USA, Inc.

Construction Contractor: Peter Brown

Commissioning Agent:AEI

GREEN=4X GOOD

Good for the present, Good for the future, Good for the Planet, Good for the bottom line


  • Login