NU-ROOF. SCHIPHOL MEETING March 1 5th 2011. D’APPOLONIA. Objectives of this meeting. Update of the test plan and responsibilities. Still on going. LAB TESTS (INCLUDING ARTIFICIAL AGEING TESTS). Results on PCM: end of march. TESTING RIG FOR ENERGY PERFORMANCE.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' NU-ROOF' - abra-weber


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

NU-ROOF

SCHIPHOL MEETING

March 15th 2011

D’APPOLONIA



Update of the test plan and responsibilities

Still on going

LAB TESTS (INCLUDING ARTIFICIAL AGEING TESTS)

Results on PCM: end of march

TESTING RIG FOR ENERGY PERFORMANCE

Start: beforenextgeneral meeting in June

Start: beforenextgeneral meeting in June

APPLICATION TESTS

NATURAL AGEING TESTS 6 MONTHS

Start: january 2012

ONE OR TWO FINAL PRODUCTS: DEMO


Testing Rig

PROCEDURE:

1) Start with membrane alone without back materials

Assemble the 4 versionswith the polystirene

Make a first runwithconstantirradiationmethod

2) Glue metal and make a secondrun

3) Glueinsulation and make a thirdrun

4) Take another set ofmembranes and gluemortar and concrete

Make a fourthrunwithconstantirradiationmethod

5) Take another set ofmembranes and glueinsulation and mortar and concrete

Make a fifthrunwithconstantirradiationmethod

6) Ifpcmhaseffect take the threesetsofstratigraphies and make a risingsunsimulation (wholedayuntil 18 and thenswitch off the light to simulate chargeof PCM)


First general considerations on the project

Testingrigis late: what are the reasonswhy the shippingfromBornerto NTUA went wrong?

The associations are impatienttohearfrom some results and start collaboration on applicationprocedures, wepromised some preliminaryresultsbyApril Wp2 is due at month 16 (April): how long do wehavetopostpone wp2 delivery? When can we start sending some samplesforapplicationtests?

Nextgeneral meeting = June

Big disseminationevent = November