Team 7: Engineering an Alternate Route to Styrene

Team 7: Engineering an Alternate Route to Styrene. Larae Baker. Jonathan Bush. Maxine Bent. Adam Jones. Michael Heslinga. Outline. Re-introduction Design Process Struggles Changes. Re-Introduction. Design a styrene plant on HYSYS, a computer simulator Capacity: 2 billion lbs/year

abiola
Download Presentation

Team 7: Engineering an Alternate Route to Styrene

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Team 7:Engineering an Alternate Route to Styrene

  2. Larae Baker Jonathan Bush Maxine Bent Adam Jones Michael Heslinga

  3. Outline • Re-introduction • Design Process • Struggles • Changes

  4. Re-Introduction • Design a styrene plant on HYSYS, a computer simulator • Capacity: 2 billion lbs/year • $0.70/lb • 14% of US production • New chemical process • Ethane instead of Ethylene

  5. Design Process • Research • Base Case • Detailed Equipment Design • Reactors • Separations • Other equipment • Economic Optimization • Finalized Design

  6. Process Design

  7. Struggle • Separations • Not in patents • Heuristics • No kinetic data • Cannot determine a rate law • Assumed conversion and selectivity

  8. Changes since December • Kinetics • Working base case • Optimization beginning • Catalyst regeneration plan • More detailed schedule • Plant Details • 50-60 acres • Texas/Louisiana

  9. THANKS FOR LISTENING!QUESTIONS?