1 / 78

Clos ing Report July 14-19, 2019 Austria Congress Center Vienna, Austria

20th Anniversary Year 121st Session of meetings of the IEEE 802.15 Working Group for Wireless Specialty Networks. Clos ing Report July 14-19, 2019 Austria Congress Center Vienna, Austria. 802.15WG Chair Bob Heile, Wi-SUN Alliance 802.15 Vice Chairs Rick Alfvin, Linespeed

Albert_Lan
Download Presentation

Clos ing Report July 14-19, 2019 Austria Congress Center Vienna, Austria

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 20th Anniversary Year121st Session of meetings of the IEEE 802.15 Working Group for Wireless Specialty Networks Closing Report July 14-19, 2019 Austria Congress Center Vienna, Austria Robert F. Heile, Decawave

  2. 802.15WG Chair Bob Heile, Wi-SUN Alliance 802.15 Vice Chairs Rick Alfvin, Linespeed Pat Kinney, Kinney Consulting 802.15 Organization Chart Secretary Pat Kinney, Kinney Consulting Assistant Secretary Mike McInnis, Boeing To add your name to the WG/TG/SG/IG reflectors please go to www.ieee802.org/15 • STUDY GROUPS: • INTEREST GROUPS • IG Dependability (of Radio Links) • Chair: Ryuji Kohno, • IG Profiles • Chair: Don Sturek, Itron • IG Vehicular Assistive Technology • ChairYeong Min Jang, KookminUni • IG 15.4 Guide • Chair: TBD • STANDING COMMITTEES • SC IETF • Chair: Pat Kinney, Kinney Consulting • SC WNG • Chair:: Pat Kinney, Kinney Consulting • SC Maintenance / Rules • Chair:: Pat Kinney, Kinney Consulting • TAGs • TeraHertz (THZ) • Chair: Thomas Kürner, • Technische Universität Braunschweig Working Group Technical Editor James Gilb Task Groups TG4md 15.4 Revision Chair: Gary Stuebing, Cisco TG9ma 802.15.9 Revision 1 Chair: TeroKivinen, Self • TG4w 15.4 Low Power Wide Area (LPWA) • Chari: Robert, Jörg • Friedrich-Alexander-Universität TG12 Consolidated 15.4 ULI Chair: Pat Kinney, Kinney Consulting TG4y Security Next Gen (SECN) Chair: Don Sturek, Itron TG13 Gigbit OWC Chair: Volker Jungnickel Fraunhofer Heinrich Hertz Institute TG4z 15.4 Enhanced Impulse Radio (EIR) Chair: Tim Harrington, Pro-ID TG22 Spectrum Characterization and Occupancy Sensing Chair: ApurvaMody, BAE xxx Robert F. Heile, Decawave

  3. Vienna Session ObjectivesJuly 14-19, 2019 TASK GROUP 4w –LPWA Enhancements to LECIM PHYs • Finalizing first draft for WG e-Ballot • Updating work activity and time line TASK GROUP 4y –Security Next Generation (SECN) • Discussing proposals • Updating work activity and time line TASK GROUP 4z –Enhanced Impulse Radio (EIR) • Comment Resolution from first WG Ballot • Updating work activity and time line Robert F. Heile, Decawave

  4. Vienna Session ObjectivesJuly 14-19, 2019 TASK GROUP 15.4md –Revision 4 • Comment resolution from last Ballot • Continue seeking input on corrections, changes, and areas for possible deprecation TASK GROUP-9ma 15.9 Revision 1 • Resolve comments on PAR and CSD • Obtain approval from EC to move forward TASK GROUP 12 -15.4 Upper Layer Interface (ULI) (Not meeting in Vienna) • continue work on developing draft • Update Project Plan/Timeline Robert F. Heile, Decawave

  5. Vienna Session ObjectivesJuly 14-19, 2019 TASK GROUP 13 –Multi Gigabit/sec OWC • Finalize work on ballotable draft • Update Project Plan/Timeline TASK GROUP 22 -15.22.3 Spectrum Characterization and Occupancy Sensing (SCOC) • Obtain approval to start the SA Ballot • Update Project Plan/Timeline Interest Group- Dependability (DEP): • Discuss Contributions • Define potential Standard’s opportunity • Evaluate if Study Group is warranted Robert F. Heile, Decawave

  6. Vienna Session ObjectivesJuly 14-19, 2019 Vehicular Assistive Technology (VAT) IG: • Discuss opportunities for OWC standards work for V2V and V2B communications • Define potential Standards opportunity • Evaluate if Study Group is warranted Profiles Interest Group • Assemble major 15.4 use cases and identify what 15.4 features and settings are used • Publish results on 802.15 web site for standards and industry use. THz Technical Advisory Group: • Review & discuss current state of technology • Evaluate any potential Standards opportunities Robert F. Heile, Decawave

  7. Vienna Session ObjectivesJuly 14-19, 2019 IETF Standing Committee (not meeting in Vienna) • IETF105 Prep • Next steps on 15.4w (LPWA) and IETF LPWAN • Hear contributions • Next steps NEW PROJECTS STANDING COMMITTEE (WNG) • Review/discuss contributions MAINTENANCE STANDING COMMITTEE • Review/discuss contributions (if any) RULES STANDING COMMITTEE • Review/discuss changes regarding creating a TAG group category in the OM. Robert F. Heile, Decawave

  8. Robert F. Heile, Decawave

  9. 802.15.4MDJuly IEEE 802.15.4md Opening and Closing V1.0 Gary Stuebing Cisco Robert F. Heile, Decawave

  10. 15.4md Sessions this Week Robert F. Heile, Decawave

  11. Agenda • Opening Session • Call for Patents • Review minutes and approve minutes from last Face to Face. • Approve CRG Minutes • Results of LB158 (audited) Robert F. Heile, Decawave

  12. Agenda • Opening Session • Total Comments • Total Comments • Schedule for Week • Review Comments Robert F. Heile, Decawave

  13. IEEE 802.15.4md Closing Report • There were 5 sessions • Minutes are at DCN 15-19-0354-00 • Call for patents was made • Minutes for F2F and CRG were approved • Audited results of LB 158 were communicated • Comments were reviewed • Editorial comments were passed to the Editor for resolution • Technical comments were assigned Robert F. Heile, Decawave

  14. IEEE 802.15.4md Closing Report • Technical comments were resolved. • Latest CRG Spreadsheet has been uploaded • DCN 15-19-0271-011 • Timeline was reviewed • Rogue Comments accepted • DCN 15-19-0340-00 • Comment group formed and motion for recirc filed • Draft Agenda Posted • DCN 15-19-0343-00 Robert F. Heile, Decawave

  15. IEEE 802.15.4md Closing Report Robert F. Heile, Decawave

  16. Closing Report - Revised Timeline • VIENNA PLENARY • Comment Resolution • Form CRG and 15 Day Letter Ballot conditional recirculation to start before August 26th • HANOI INTERIM • Comment resolution • Form CRG and request EC e-ballot for • conditional sponsor ballot approval – Sep 2019 • Start Sponsor Ballot (30 days) - Starting 2 Oct and complete by • 31 Oct

  17. Closing Report - Revised Timeline • KONA PLENARY • Comment resolution • Form CRG and initiate Recirc ballot to begin Nov 17, 2019 • Request Conditional RevCom approval – November 18, 2019 • Submission to RevCom in mid Dec-2019 • Fallback is January

  18. TG Motion for TG4md Letter Ballot Move that TG4md formally request that the 802.15 WG start a WG Recirculation Letter Ballot requesting approval of document P802.15.4-REVd-D04 and to forward document P802.15.4-REVd-D05 to Standards Association Ballot pending the completion and inclusion of the edits in the draft. Moved: Phil Beecher Second: Chris Hett Robert F. Heile, Decawave

  19. TG CRG Motion • Move that TG4md requests 802.15 WG approve the formation of a Comment Resolution Group(CRG) for the WG balloting of the P802.15.4-REVd-D03 with the following membership: Gary Stuebing(As Chair), Don Sturek, Kunal Shah, Ruben Salazar, Tero Kivinen, Phil Beecher and Shoichi Kitazawa. The 802.15.4md CRG is authorized to approve comment resolutions and to approve the start of recirculation Letter Ballot of the revised draft on behalf of the 802.15 WG. Comment resolution on ballots between sessions will be conducted via reflector email and via teleconferences announced to the reflector as per the LMSC 802 WG P&P • Moved By: Don Sturek • Seconded By: Phil Beecher Robert F. Heile, Decawave

  20. WG CRG Motion Move that 802.15 WG approve the formation of a Comment Resolution Group (CRG) for the WG balloting of the P802.15.4-REVd-D03 with the following membership: Gary Stuebing(As Chair), Don Sturek, Kunal Shah, Ruben Salazar, Tero Kivinen, Phil Beecher and Shoichi Kitazawa. The 802.15.4md CRG is authorized to approve comment resolutions and to approve the start of a recirculation letter ballot of the revised draft on behalf of the 802.15 WG. Comment resolution on ballots between sessions will be conducted via reflector email and via teleconferences announced to the reflector as per the LMSC 802 WG P&P Moved By: Gary Stuebing Seconded By: Robert F. Heile, Decawave

  21. TG 802.15.4w LPWAJuly 2019 Closing Report Joerg RobertFAU Erlangen-Nuernberg Joerg ROBERT, FAU Erlangen-Nuernberg

  22. Main Agenda Items for the Week • Approval of Atlanta Meeting Minutes • LB Comment Resolution • Future Schedule • AOB Joerg ROBERT, FAU Erlangen-Nuernberg

  23. TG 15.4w Schedule for the Week Joerg ROBERT, FAU Erlangen-Nuernberg

  24. Meeting Achievements • Resolved all Letter Ballot comments • Incorporated LB comments into draft • Two motions for LB recirculation and formation of CRG • Discussion on future schedule • Started Recirculation of Draft D3 Joerg ROBERT, FAU Erlangen-Nuernberg

  25. TG4w Draft Schedule Joerg ROBERT, FAU Erlangen-Nuernberg

  26. CRG Telephone Conferences • Time and date will be announced on reflector on time Joerg ROBERT, FAU Erlangen-Nuernberg

  27. WG SA Conditional Motion • Motion: 802.15 has reviewed and approves the CSD 15-18-0053-04, and the CA document 15-19-0165-01; and requests conditional approval from the EC to submit P802.15.4w_D3(or current revision) to Standards Association ballot. • Moved by: Joerg Robert • Seconded by: Joerg ROBERT, FAU Erlangen-Nuernberg

  28. Meeting Minutes • Minutes are available in document 15-19/351r0 • Special thanks to Henkfor taking the minutes Joerg ROBERT, FAU Erlangen-Nuernberg

  29. TG4w Goals for Hanoi • If SB will finish before/during Hanoi • Approval of Vienna and CRG Minutes • Schedule • Comment Resolution • Future Schedule • AOB • 6 slots requested • If SB will not finish before/during Hanoi • Skip meeting  0 slots Joerg ROBERT, FAU Erlangen-Nuernberg

  30. Thank You!Any Questions? Joerg ROBERT, FAU Erlangen-Nuernberg

  31. IEEE 802.15.4y SECN Closing report July 18, 2019 Don Sturek IEEE 802.15.4y SECN Chair Don Sturek (Itron)

  32. Work Plan • Review the Section 9, Annex B and Annex C changes • Align Section 9, Annex B and Annex C changes with 4md draft • Update timeline and create closing report Don Sturek (Itron)

  33. Work Plan for 4y • Update key descriptor: Tero (in process) • Update 15.4-2015 Section 9 Security Text (see 15-18-0324-01 and 15-19-0081-04) (Tero and Don) • Create “Annex B” for AES-256-CCM: Don (15-19-0081-04) • Create “Annex C” for AES-256-CCM: Tero (in D03 of 4md revision) • Address ANA process for adding in cipher suites (use AES-256-CCM as first example): Don (to be addressed in September) Don Sturek (Itron)

  34. Progress in Vienna • Timeline • Key Descriptor and Section 9 changes– August2019 • Annex B for AES-256 – Done • Annex C for AES-256 – Done • Informal Task Group Review–August2019 • WGLetter Ballot – September 2019, conditional approval from EC for SA ballot • SA Ballot – January 2020 Don Sturek (Itron)

  35. Agenda for September • Get the draft of the amendment completed by mid-August, post in the private area for informal review closing before IEEE 802 Interim in September • Address informal review comments • Put the draft out for WG ballot at the conclusion of the September meeting, form a CRG Don Sturek (Itron)

  36. IEEE 802.15.4z EiR Closing report July 18, 2019 Tim Harrington IEEE 802.15 TG4z EiR Chair

  37. Accomplishments • Significant progress in Comment Resolution to WG Letter Ballot 156

  38. Motion Move that 802.15.4z TG approve the formation of a Comment Resolution Group (CRG) for the WG balloting of the P802.15.4z_D2 with the following membership: Ayman Naguib (Apple), Seongah Jeong (Samsung), Aditya Padaki(Samsung), Billy Verso (Decawave), Frank Leong (NXP), Tim Harrington (Chair) (Pro-ID), Ben Rolfe (Blind Creek), David Barras (3dB), Boris Danev (3dB), Brima Ibrahim(NXP), Peter Sauer (Microchip), JaroslawNiewczas (Decawave), Zheda Li (Samsung), Clint Chaplin (Samsung), Jochen Hammerschmidt (Apple) The 802.15.4z CRG is authorized to approve comment resolutions, edit the draft according to the comment resolutions, and to approve the start of recirculation ballots of the revised draft on behalf of the 802.15 WG. Comment resolution on recirculation ballots between sessions will be conducted via reflector email, via teleconferences and face to face meeting(s) announced to the reflector as per the LMSC 802 WG P&P.

  39. Timeline • March 2018 – 2nd Call for proposals – resolved comments on PAR and CSD • July 2018 – Review new proposals – Merge Baselines for draft • September 2018 – Drafting using merged baselines • November 2018 – Drafting using merged baselines • January 2019 – Send Draft to TEG • March 2019 – TEG Comment Resolution - Initiate WG Letter Ballot • May 2019 – Comment Resolution • July 2019 – Comment Resolution – Recirculation • September 2019 - Comment Resolution – Working Group Recirculation • November 2019 - Request Approval to proceed to Standards Association Ballot • January 2020 – Comment Resolution – Recirculation • March 2020 - Comment Resolution - Request to Forward to RevCom

  40. Agenda for September Interim • Comment Resolution • Recirculation • Request Approval to proceed to Standards Association Ballot If Ready

  41. July 2019 IEEE 802.15 TG13 Multi-Gbit/s Optical Wireless Communication July 2019 Closing Slides Date: 2019-07-18 Author: Volker Jungnickel (Fraunhofer HHI)

  42. July 2019 Abstract This presentation contains the IEEE 802.15 TG13 Multi- Gbit/s Optical Wireless Communication Closing plenary slides for the July 2019 session in Vienna. Volker Jungnickel (Fraunhofer HHI)

  43. July 2019 TG13 schedule for Vienna Volker Jungnickel (Fraunhofer HHI)

  44. July 2019 TG13 activities this week • 6slots in Vienna • Finalizedraft • Created TBD list (appendedtomeetingslides in doc. 15-19/0274r5) • TBDs mostlyin MAC, partlyrelated also toPHYs • Worked on TBDs • Discuss CA document • Preparenewdraftcoming out ofthemeeting • Send itfor informal circulation WG15 Technical Editor Volker Jungnickel (Fraunhofer HHI)

  45. July 2019 TG13 Motion #53 Include the resolution of comments against TG13 draft 5.0 as contained in doc. 15-19/0323r0 into the new TG13 draft D6.0. The Technical Editor is granted the right to correct the section numbering and make editorial changes. Moved by Nikola Seconded by Sang-Kyu Y / N / A = 4 / 0 / 0 Motion passed. Volker Jungnickel (Fraunhofer HHI)

  46. July 2019 TG13 Plans until September • Create newdraft D6.0 and send itfor informal reviewbyTG13 andtothe WG Technical Editor (James Gilb) • Continueworking on TBDs, createnewtextblocks Volker Jungnickel (Fraunhofer HHI)

  47. July 2019 TG13 Motion #54 TG13 Telcos are scheduled on • July 30 10:00-11:00 EST on TBD • August 1310:00-11:00 EST on TBD • August 2710:00-11:00 EST on TBD • September 10 10:00-11:00 EST on TBD Moved by Nikola Seconded by Sang-Kyu Motion passed unanimously. Volker Jungnickel (Fraunhofer HHI)

  48. July 2019 TG13 Plans for September meeting • 6 slotsrequested • Resolvecommentsfrom internal and informal WG review • Create D7.0 and send itto WGLB Volker Jungnickel (Fraunhofer HHI)

  49. July 2019 New TG13 timeline (doc. 11-17/0288r9) Volker Jungnickel (Fraunhofer HHI)

  50. TG22 Spectrum Sharing Closing Report Accomplishments: • Created PAR extension for 802.15.22.3 • Responded to comments received from 802.11/802.3 on PAR extension • Put together package to start 802.15.22.3 SA Ballot Apurva Mody, BAE Systems

More Related