1 / 12

P07310: Electronic Shifted Manual Transmission

P07310: Electronic Shifted Manual Transmission. George Slack Team Guide Jason Botterill Team Leader, Mechanical Engineer Vaibhav Kothari Industrial Engineer Richard Cheng Electrical Engineer Yi-Fan Zhang Mechanical/Testing Engineer. Sponsor: Polaris Industries.

zuzela
Download Presentation

P07310: Electronic Shifted Manual Transmission

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. P07310: Electronic Shifted Manual Transmission • George Slack Team Guide • Jason Botterill Team Leader, Mechanical Engineer • Vaibhav Kothari Industrial Engineer • Richard Cheng Electrical Engineer • Yi-Fan Zhang Mechanical/Testing Engineer Sponsor: Polaris Industries P07310: Polaris ESMT 1 RIT Senior Design I, Project Review

  2. P07310: Project Description • Semi-automatic shifting system for the Polaris Outlaw 525 high-performance ATV. • Target market: High-performance sport ATV riders. P07310: Polaris ESMT 2 RIT Senior Design I, Project Review

  3. P07310: Key Specifications and Features • Specifications: Weight: < 7 lbs. Shift Time: < .1 sec. Cost: < $250/unit @ 5000 units built • Features: Push-Button Shift Control Reverse Lockout Gear indicator P07310: Polaris ESMT 3 RIT Senior Design I, Project Review

  4. P07310: Control Interface Design Upshift Downshift P07310: Polaris ESMT 4 RIT Senior Design I, Project Review

  5. Rider resumes normal operation System restores ignition System cuts ignition System shifts transmission P07310: System Flowchart Rider pushes shift button P07310: Polaris ESMT 5 RIT Senior Design I, Project Review

  6. P07310: Project Risk Assessment • Risk: Slow electrical design progress • PLC not sufficiently specified • Sensor parameters not sufficiently defined • Motor control scheme not defined • Proposed Mitigation: • Increased supporting professor consultation • Accelerated deliverables timetable P07310: Polaris ESMT 6 RIT Senior Design I, Project Review

  7. P07310: Project Risk Assessment • Risk: Lack of suitable test bench design • No working design has yet been produced • Current designs are inherently flawed • Proposed mitigation: • Consult with advising professors • Propose simplified design • Design/build in parallel with other systems work • Backup plan: Use ATV on jack stands for systems testing P07310: Polaris ESMT 7 RIT Senior Design I, Project Review

  8. P07310: Project Risk Assessment • Risk: Complex mechanical system • Mechanical shifting system is inherently complex • Proposed mitigation: • Develop secondary plan in parallel with primary solution P07310: Polaris ESMT 8 RIT Senior Design I, Project Review

  9. P07310: Project Risk Assessment • Risk: Shortened design schedule • ATV arrived after concept review (week 5) • True concept review occurred in week 8 (3 weeks late) • Detailed design phase running behind schedule • Proposed Mitigation: • Accelerate deliverables timetable • Increase supporting professor input to decrease development time • Reduce scope to necessary functions and features only P07310: Polaris ESMT 9 RIT Senior Design I, Project Review

  10. P07310: Product Development Process Phase Phase 0: Planning Phase 1: Transmission Concept Development Phase 2: System Level Design Phase 3: Detailed Design Phase 4: Testing and Refinement MSD I MSD II Alpha Prototype 0 1 2 3 4 Current Phase of Development P07310: Polaris ESMT 10 RIT Senior Design I, Project Review

  11. P07310: Current State of Design • Control interface system meets customer needs • Mechanical system meets customer needs (confirmation tests pending) • Electrical system is incomplete • Test bench design is incomplete • On target for $250 cost per unit • Current projected cost per unit: • Mitigations: • Development timetables for electrical system and test bench accelerated • Cost per unit projections need to be adjusted for 5000 unit run P07310: Polaris ESMT 11 RIT Senior Design I, Project Review

  12. P07310: MSD II Schedule Highlights • Wk 2: Design finalized and all components on order • Wk. 4: Test bench completed and instrumented • Wk. 4: Prototype systems completed • Wk. 6: Test bench program completed, begin ATV testing • Wk. 8: Function and performance review • Wk. 9: Documentation completed (Formal paper, poster, etc.) • Wk. 10: Final design review P07310: Polaris ESMT 12 RIT Senior Design I, Project Review

More Related