1 / 18

Status of SB2009 Rebaselining Proposal Document, Known to the Editor

Status of SB2009 Rebaselining Proposal Document, Known to the Editor. As of 20091130 vers.B N.Toge. Check: http://ilc.kek.jp/SB2009/SB20091130B.pdf. ½. Introduction / Overview (PMs) http://ilc.kek.jp/SB2009/Intro20091130B.docx. Formatted Manuscript on the web?

zubin
Download Presentation

Status of SB2009 Rebaselining Proposal Document, Known to the Editor

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status of SB2009 Rebaselining Proposal Document, Known to the Editor As of 20091130 vers.B N.Toge Check: http://ilc.kek.jp/SB2009/SB20091130B.pdf

  2. ½. Introduction / Overview (PMs)http://ilc.kek.jp/SB2009/Intro20091130B.docx • Formatted Manuscript on the web? • Yes, although still partially in WIP by PMs • Remarks • Intro • needs minor clean-up • Overview • List of what remains the same as RDR? • Cavity performance “reserve” issue • Classification • PROBABLY OK, IF PMs WORK HARD

  3. 3. SB2009 Layout (PM + Paterson)http://ilc.kek.jp/SB2009/Layout20091130A.docx • Formatted Manuscript on the web? • Yes • Author – Editor iteration? • Once • Remarks • ML length needs to be stated. • One more critical editing, anyone? • Classification • Probably OK

  4. X.X Parameters (PMs + Toge)http://ilc.kek.jp/SB2009/IntroDraft20091105A.docx • Formatted Manuscript on the web? • No • Remarks • Classification • Given up. • Has been absorbed as part of 2.2.

  5. 4.1 Gradient Issues (Yamamoto)http://ilc.kek.jp/SB2009/SRF200911230C.docx • Formatted Manuscript on the web? • Yes, although still partially in WIP by PMs + Experts • Remarks • Needs clean-up cavity performance summary • Needs sort out the statements to make in the cavity performance reserve issue • Classification • Near the edge. Needs attention.

  6. 4.2/3 Electron and Positron Sources (Brachmann, Clarke)http://ilc.kek.jp/SB2009/Injectors20091130A.docx • Formatted Manuscript on the web? • Yes • Author – Editor iteration? • Once but w. open loop • Classification • Likely to be OK, pending authors’ timely response

  7. 4.4 Damping Rings (Guiducci)http://ilc.kek.jp/SB2009/DR20091130A.docx • Formatted Manuscript on the web? • Yes • Author – Editor iteration? • Done once • Classification • Likely OK, pending small fixes.

  8. 4.5 RTML (Solyak)http://ilc.kek.jp/SB2009/RTML20091130B.docx • Formatted Manuscript on the web? • Yes • Author – Editor iteration? • Done once • Classification • Likely OK.

  9. 4.6 ML (Nantista, Fukuda)http://ilc.kek.jp/SB2009/ML20091130A.docx • Formatted Manuscript on the web? • Yes • Author – Editor iteration? • Done once • KCS known to be in WIP by authors • Important Comment • Pulse length issue needs to be explained. • Classification • Perhaps OK, pending authors’ timely response

  10. 4.7 BDS (Seryi)http://ilc.kek.jp/SB2009/BDS20091130B.doc • Formatted Manuscript on the web? • Yes • Author – Editor iteration? • Done once. • Minor open issues fixable on the spot. • Classification • Likely OK, pending addressing phys/det vs accelerator interaction issues.

  11. 4.8 CFS (Kuchler)http://ilc.kek.jp/SB2009/CFS20091130A.docx • Formatted Manuscript on the web? • Yes • Author – Editor iteration? • Done once. • Classification • Likely OK, pending small touch-ups.

  12. 5. Costing (Garbincius)http://ilc.kek.jp/SB2009/Cost20091120A.docx • Formatted Manuscript on the web? • Yes • Author – Editor iteration? • Done once. • More text / tables known to be in WIP by the author. • Classification • Likely OK, pending some guideline clarification by PMs.

  13. 6. Risk Analysis (Ross)http://ilc.kek.jp/SB2009/RiskDraft20091105.docx • Formatted Manuscript on the web? • No • Author – Editor iteration? • No • Classification • Major schedule threat

  14. A. Availability Analysis (MCR/Avail)http://ilc.kek.jp/SB2009/AvailDraft20091104.docx • Formatted Manuscript on the web? • No • Author – Editor iteration? • Authors known to be at it. ETA unclear. • Classification • Major schedule threat

  15. Critical Issues • ML length • Path length matching known to be addressed • QWT compensation needs to be stated • Energy reserve needs to be stated • ML alternate pulsing • Handling of lowE beam in highE in ML needs to be stated • Costing Reference • “Starting point” needs to be stated • Summary statements need group-wide confirmation

  16. Sections Recovering From Crisis • Intro / Overview • SRF Gradient

  17. Sections in Crisis • Risk analysis • Availability

  18. To Do at DESY Face-to-Face • Triage process • Critical open issues  • Group-wide or semi-group wide discussion and surgery on the spot. • With some follow-up work on subsequent days. • Semi-trivial touch-ups  • Identify issues on the spot. Fixes be applied by the primary authors on the fly. • With some follow-up work on subsequent days if needed. • ~17 subsections x 30 min = 9 hrs .eqv. 1 Full Day + reserve • Time is limited: We need to-the-point and concise-efficient discussion and response. No digressing speech, no tangential commentary, no unproductive ranting, please. • Prep and org for AAP • One quarter day

More Related