slide1 n.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
New Radon Resistant Construction & Mitigation National Tribal Forum-2012 PowerPoint Presentation
Download Presentation
New Radon Resistant Construction & Mitigation National Tribal Forum-2012

Loading in 2 Seconds...

play fullscreen
1 / 11

New Radon Resistant Construction & Mitigation National Tribal Forum-2012 - PowerPoint PPT Presentation


  • 100 Views
  • Uploaded on

New Radon Resistant Construction & Mitigation National Tribal Forum-2012. Vivian Craig, Sr. Environmental Specialist NNEPA Radon Program. New Radon Resistant Construction. Building the framework - Should we be concerned about Radon-YES.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'New Radon Resistant Construction & Mitigation National Tribal Forum-2012' - zofia


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1

New Radon Resistant

Construction & Mitigation

National Tribal Forum-2012

Vivian Craig,

Sr. Environmental Specialist

NNEPA Radon Program

new radon resistant construction
New Radon Resistant Construction

Building the framework - Should we be concerned about Radon-YES.

building the framework to conduct a radon mitigation workshop
Building the Framework to conduct a radon mitigation workshop
  • NNEPA Radon Program has to follow the following:
    • NN Procurement Policy process.
    • Regional Business Development Office (RBDO)
      • Source List
      • Sole Source List
building the framework to conduct a radon mitigation workshop1
Building the Framework to conduct a radon mitigation workshop
  • Section 164 Review Process
    • Department & Phone No.
    • Document
      • Brief description of attachments
    • Reviewers
      • Sponsor/Program Signature
      • Division Director Signature
      • Office of Management & Budget
      • Office of Attorney General
      • Office of the President
      • Legislative Counsel
      • Committee Chairperson
    • Back to O.M.B. for Administrative Implementation
    • Business Regulatory Dept.
    • Comments Section

Signature Approval Sheet (SAS)

building the framework to conduct a radon mitigation workshop2
Building the Framework to conduct a radon mitigation workshop
  • The Instructor
    • Mr. Brad Turk
    • Environmental Bldg. Sciences, Inc.
    • Las Vegas, NM
  • Exceptional skills:
    • As an Instructor
    • People skills
    • Highly recommended
  • Workshop scheduled for August 2012
building the framework to conduct a radon mitigation workshop3
Building the Framework to conduct a radon mitigation workshop
  • Occupant on fixed income
  • No access to the crawlspace.
  • Install a Solar Panel to run the one fan 6 inch radon fan
  • Crawlspace 8 to 14 inches
  • No electricity at time of selection
building the framework to conduct a radon mitigation workshop4
Building the Framework to conduct a radon mitigation workshop
  • Perfect home for radon mitigation.
  • Committed Homeowner
    • Crawlspace @ 3-4ft.
    • Clean crawlspace
    • Solid foundation no cracks along the joints
    • Access to crawlspace
    • Install one 6 inch radon fan
contaminated structures project updates
Contaminated Structures Project Updates

Hogan with dirt floor, no utilities and water

After includes Electricity, Water and Septic System.

contaminated structures project updates1
Contaminated Structures Project Updates

Before with one bedroom including utilities

After three bedroom w/all utilities, water and septic system

After

Before

contaminated structures project updates2
Contaminated Structures Project Updates

6 bedroom w/utilities, water and septic system.

6 bedroom-3 bath (1 ADA) w/utilities, water and septic system.