An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NRC* Perspective on HDPE Road Maps NESCC Meeting March 28, 2013 Washington, D.C. Eric Focht, Materials Engineer U. S. Nuclear Regulatory Commission Office of Nuclear Regulatory Research Division of Engineering Component Integrity Branch eric.focht@nrc.gov * The views of the author do not necessarily reflect those of the Nuclear Regulatory Commission.

  2. NRC HDPE Activities2006 - Present • ASME approved Code Case N-755 in 2007 • NRC concerns included in balloting process for N-755 • Promulgated NRC concerns regarding Code Case N-755 to ASME SWG on PP in 2008 • NRC approved two relief requests in 2008 • Callaway and Catawba • NRC staff have been very active in the numerous ASME HDPE piping groups since 2007 • Supported various ASME-EPRI workshops • Attended fusion operator training

  3. NRC HDPE Activities2006 – Present (cont.) • Conducted confirmatory research on HDPE piping materials: • SCG testing of parent and fusion joints • Assessed volumetric examination techniques • Technical assistance with proposed ASME Code rules

  4. Progress!Working together • NRC Concerns • Many of the original NRC concerns have been addressed • Design • Several keys concerns still need to be addressed • Fusion • Volumetric examination • Design • Most concerns regarding design have been addressed • Some remain open (e.g. thermal gradient stress, modulus) • Fusion • SC IX Code rules help but do not address all NRC concerns • They need to go into a Code Case along with additional NRC requirements • NDE • SC III, V & XI rules being developed • Code Case N-808 (SC XI) and N-755 (SC III)

  5. Code Cases and Road Maps Code Cases • ASME has approved N-755, but the NRC has not due to unresolved concerns. • NRC was informally requested to consider conditionally approving N-755 to help provide a stable regulatory path for implementation. • A conditionally approved N-755: • Three main areas: • Design • Fusion • NDE • NRC reluctant to condition N-755 earlier due to the number of unresolved concerns • Design • Furthest along in terms of NRC concerns being addressed • May be the “easiest” to condition • Fusion • SC IX rules in addition to E. Reichelt comments need to be incorporated into Code Case N-755. • More conditions may still need to included • NDE (volumetric examination) • Volumetric examination requires the most work. • Code Case N-808: No Code rules exist, but ASME is working on N-808 to develop them (also in TGs).

  6. Code Cases and Road Maps Road Maps • The ASME and NESCC road maps, together, present a good plan for addressing NRC concerns. • Combining into a single road map will help with implementation. • If implemented, the road map should help address items that may lead to: • A conditionally approved Code Case(s) for HDPE piping in the short term. • Eliminate conditions on Code Case(s)