1 / 7

Benefits of a Multi-year Resource A dequacy Program May 20, 2014

Benefits of a Multi-year Resource A dequacy Program May 20, 2014. Karl Meeusen, Ph.D., Market Design and Regulatory Policy Lead Market and Infrastructure Policy. There many mechanisms used for capacity procurement at the CPUC and ISO . Long-Term

zeal
Download Presentation

Benefits of a Multi-year Resource A dequacy Program May 20, 2014

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Benefits of a Multi-year Resource Adequacy ProgramMay 20, 2014 Karl Meeusen, Ph.D., Market Design and Regulatory Policy Lead Market and Infrastructure Policy

  2. There many mechanisms used for capacity procurement at the CPUC and ISO • Long-Term • Long-Term Procurement Planning process (CPUC) • RPS procurement (CPUC) • Energy Efficiency (CPUC) • Demand Response (CPUC) • Storage (CPUC) • Year-ahead • Resource Adequacy (CPUC) • Capacity Procurement Mechanism (ISO) • Real-time • ISO’s Capacity Procurement Mechanism (ISO) • ISO’s Residual Unit Commitment (ISO)

  3. Rapid Structural Changes are Impacting our Industry’s Traditional Means of Producing and Delivering Energy Policy and technology are driving change: • Once Through Cooling policy to protect marine life. • Increasing Renewable Portfolio Standard. • Growing numbers of distributed energy resources. Opportunity • Link planning and procurement functions across multiple years to address these structural changes and secure resources in the right places with the right capabilities.

  4. Linking planning and procurement functions provide a more holistic and complete view of short and long-term system needs The Joint Reliability Plan Plan to ensure long-term reliability in California

  5. Benefits of a Multi-year Resource Adequacy Program

  6. There are at least four benefits of a Multi-year Resource Adequacy Program • Minimizes Disorderly Retirement • Better economic signals sent to market participants to encourage “efficient” retirements • Encourages Preferred Resources • More time for a developer to create a program or product • Creates an obligation, and therefore certainty around the development of preferred resources • Links Procurement and Planning Functions • More holistic and complete view of resource needs over the short and long-term horizon • Provides Investment Signals to Existing Resources • Aligns capacity procurement and timing of investment decisions for existing resources- upgrades, repowers, capacity additions, flexibility

  7. A multi-year requirement must include 100% forward capacity requirements for flexible resources • The flexible requirement must be 100% into the future in order for the multi-year RA forward requirement to mitigate the risk of retirement • The flexible resources at risk of retirement: • Resources with high operational costs • Resources that will require significant investment to remain in service • Generic resources that will require investment to become flexible

More Related