broken arrow south loop bridges n.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
BROKEN ARROW SOUTH LOOP BRIDGES PowerPoint Presentation
Download Presentation
BROKEN ARROW SOUTH LOOP BRIDGES

Loading in 2 Seconds...

play fullscreen
1 / 1

BROKEN ARROW SOUTH LOOP BRIDGES - PowerPoint PPT Presentation


  • 111 Views
  • Uploaded on

Oklahoma. Turnpike. Authority. Proposal No. _____. Contract No. CKT-1344. BROKEN ARROW SOUTH LOOP BRIDGES. The work to be performed under Contract Number CKT-1344 consists of constructing Section 4 bridges which are two span structures including five TPU bridges and two TPO bridges.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

BROKEN ARROW SOUTH LOOP BRIDGES


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
    Presentation Transcript
    1. Oklahoma Turnpike Authority Proposal No. _____ Contract No. CKT-1344 BROKEN ARROW SOUTH LOOPBRIDGES • The work to be performed under Contract Number CKT-1344 • consists of constructing Section 4 bridges which are two span • structures including five TPU bridges and two TPO bridges. • These bridges carry vehicular traffic over the Broken Arrow • South Loop and West Branch of Broken Arrow Creek. The • bridges utilize concrete deck on prestressed concrete beams • consisting of 72-inch Bulb Tees (5,104 LF) of AASHTO • Type IV (8,185 LF). The bridge substructures utilize stub • abutments founded on steel H-piles along with concrete bent • frame piers founded on drilled shafts and pile footings. The • horizontal and vertical alignment of bridges consist of both • tangents and curves. • Additionally, the work to be performed consists of placing • pavement and subbase, installing guardrail and fencing, and • constructing driveways, drainage systems, topsoil and seeding • for E. 111th Street South, South 129th East Ave., South 145th • E. Ave., South 161st E. Ave. and South 177th E. Ave. The • work also includes removal of the detour roadways and grading at • E. 111th Street South, South 129th E. Ave., South 145th E. Ave., • South 161st E. Ave. CONSULTING ENGINEERS The Benham Group, Inc. 9400 North Broadway Oklahoma City, OK 73114 PREPARED BY HNTB Corporation 4608 South Garnett Road Tulsa, OK 74146 June, 1999