T1 ITB Status. Phase 1“Proof of Concept” Field Test conducted McNary U9 Dec 14-16 05 Although limited operating range tested, results promising Continuous monitoring of unit to identify “steady- state” operation and when to log data Interfaces with GDACS (security issues)

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'T1 ITB Status' - zarola


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
t1 itb status

T1 ITB Status

Phase 1“Proof of Concept” Field Test conducted

McNary U9 Dec 14-16 05

Although limited operating range tested, results promising

Continuous monitoring of unit to identify “steady- state” operation and when to log data

Interfaces with GDACS (security issues)

Numerous fixes & improvements identified

Once corrected, “unattended and automatic” collection of data possible

t1 itb phase 1
T1 ITB Phase 1
  • Test to verify bugs have been corrected
  • Parallel to IH index testing Feb ’06
  • Off-cam (Fixed Blade) testing of Kaplan unit should prove applicability of ITB to Francis unit
  • Testing @ IH in lieu of previously proposed CJ verification test
type 1 itb phase 2
Type 1 ITB Phase 2
  • Procure non-GDACS ITB ~$12k
  • Procure additional GDACS ITB ~$12k
  • Demonstration Project Kaplan (GDACS):

LGR 4-6 proposed site (FY07)

  • Demonstration project Francis (non-GDACS):

Site tbd, DWO or CJ

t1 future work
T1 Future Work
  • T1 Implementation into GDACS:

- ITB source code availability

- ITB long term maintenance

- Develop code for GDACS

Est. $850k next 3 yrs to develop

t1 future work1
T1 Future Work
  • W-K Rel Flow Signal into GDACS
    • X-ducers w/ automated flushing system on each unit
      • B1,B2, TD, JD, CJ, IH, LGR, LMO, LGO

97 Kaplan & 27 Francis installations

      • AF, Libby & Willamette Valley Projects
    • E&D FY06
    • Implementation FY07 & FY08
  • Develop new discharge tables
absolute flow cj dwo
Absolute Flow CJ & DWO
  • 2 units CJ, 3 units DWO currently installed
    • Flow value into GDACS
  • Decision on remaining units
    • Range of possibilities:
      • Acoustic flow meters on every unit $$$
      • Gibson Test every unit $$$
      • Acoustic flow single unit given family & index test remaining units of same family
    • DWO testing to verify method (3)
    • If successful, phased implementation at CJ