1 / 35

AASHTO Construction Sub-Committee Annual Meeting Virginia Beach

AASHTO Construction Sub-Committee Annual Meeting Virginia Beach. Adrian Sheppard “Director for PPP and Asset Management”. Ensign. Delivering Highway Services through The Portsmouth PFI experience. 1 st August 2011. Overview. Background to the Contract - Funding issues

zanta
Download Presentation

AASHTO Construction Sub-Committee Annual Meeting Virginia Beach

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AASHTO Construction Sub-Committee Annual MeetingVirginia Beach Adrian Sheppard “Director for PPP and Asset Management”

  2. Ensign Delivering Highway Services through The Portsmouth PFI experience 1st August 2011

  3. Overview • Background to the Contract - Funding issues • Contract Structure & Controls • Contract Efficiencies • Delivery through the Core Investment Period • Transition into the Life Cycle Replacement Period

  4. The City of Portsmouth • Unitary Authority - 1997 • Population 190 000 • Predominantly Urban • Gateway to Europe • Total Road Length 455km • PRN 66km • SRN 94km • TRN 295km • 84 Structures • 20 000 lighting units

  5. Key Issues • Strategically important city • Cyclical peak traffic flows • Residential and business pressures • 27 Political Wards • Competing needs

  6. Key Issues • Road Condition • 48% failed or critical • Insurance Claims • Public Dissatisfaction • Insufficient funding • Lack of investment • Other priorities

  7. Bid Process • OBC Outline Business Case • EOI Expression Of Interest • PQQ Pre-Qualification • ISOS Outline Solutions • ISDS Detailed Solutions • ISRS Refined Solutions • CFT Final Tender • PB Preferred Bidder • FC Financial Close

  8. The HighwayMaintenance Project • Ensign Highways Ltd • 25 year Contract • 5 year CIP • $850m

  9. Contract Value Core Investment Period 5yrs $100m Life Cycle Replacement 20yrs $80m Operations & Maintenance 25yrs $670m Total $850m

  10. Advantages • Transfer of risk to service company • Local authority gains non-refundable grant from the Government to help with the cost of borrowing • Service budget is ring fenced and certain • Significant and guaranteed improvements in network condition • Hand-back in a guaranteed condition with residual life

  11. Exclusions fromthe Contract • Urban Traffic Control Systems • Bus Stops • Refuse Collection • Coastal Protection • Retained Highways Functions • Abandoned Vehicles • Other City Council Services

  12. Key Principle Design, construction and operation risk transferred to the Service Provider No third party claims to PCC “Fence to Fence” Concept

  13. Shared Risks • Major Structural Repairs • Bridges • Highway drainage • Change in Standards • Other Network Changes • Insurance- Total Loss of the Network • Interest Rate Risk • Inflation Risk • Force Majeure

  14. Structure

  15. Role of the SPV • The SPV is the interface between all parties to the project: • The Public Authority and their advisors • The Lenders and their advisors • The Contractor and their advisors • The Sponsors and their advisors

  16. Role of the SPV • Core tasks for the SPV management function include: • Develop and deploy processes, systems and procedures • Technical and commercial risk assessment and management • Financial reporting • Performance monitoring

  17. Role of the SPV • Core tasks for the SPV management function include: • Management of funding arrangements • Contract profile and promotion • Dispute management • Partnership development

  18. Scope of Work • Refurbishment • Winter maintenance • Periodic maintenance • Sweeping & cleansing • Third party claims • Statutory Undertakers • Network Management Fence to Fence

  19. Payment Mechanism • Usage Payment = Shadow toll (10%) • Availability Payment = Monthly lump sum (90%) • Deductions (Performance based) NCI AP 18.6 100% 12.5 65% 5 yrs 20 yrs Investment period Maintenance

  20. Monitoring • Surveys • Inspections • Internal Audits • PCC Independent Certifier • Bank’s Technical Advisor • Residents / City Help Desk • Councillors • Newspapers

  21. Liaison and Dispute Resolution Procedures ‘Expert’ ‘Expert’ ‘Principals’ ‘Principals’ Network Board Network Board Progress MeetingOperational Meeting Progress MeetingOperational Meeting

  22. Default Notice Periods • Service Points • Warning Notice • Contract Termination

  23. R & D Pavement design Project and Construction Management Model Development Expertise & Innovation • Products & binders • Recycling & Environment

  24. Performance Measures Number of public enquiries

  25. Performance Measures

  26. Performance Measures

  27. Performance Measures

  28. Performance Measures

  29. Performance Measures

  30. Performance Measures

  31. Efficiency Savings • Investment at right time • Combined Maintenance/Improvement Schemes • Maintenance/Capital Works/Cleansing Teams interact • Shared Office • Joint Training Initiatives • Seeking Innovation • Better management of Utilities activities

  32. Efficiency Savings • Integrating design with construction ▪ Improved buildability ▪ Better budget management ▪ Speedier construction process ▪ Better interface management ▪ Improved response

  33. Recognition • Public Satisfaction 2005 • 4Ps Excellence Award 2006 • IHT Effective Partnership Award 2008 • Other Local Authorities in UK following model • Public Satisfaction 2008 • Highways Partnership Awards 2009 • ICE Award 2010 - Best Community Project

  34. Local CommunityInvolvement • Mayfield School • Tidy School • The News “We can do it” • PCC Tidy campaign • Portsmouth in Bloom • Brunel commemoration • Kid safe • University of Portsmouth

  35. THANK YOU asheppard@colasinfrastructure.com