1 / 18

Who Wants to be an EMA Director? For $7,000.00

Who Wants to be an EMA Director? For $7,000.00. $100.00. The four phases of Emergency Management are:. $100.00. The four phases of Emergency Management are:. Response, Preparedness, Mitigation, Relaxation Mitigation, Protection, Preparedness, Response

zan
Download Presentation

Who Wants to be an EMA Director? For $7,000.00

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Who Wants to be an EMA Director? For $7,000.00

  2. $100.00 The four phases of Emergency Management are:

  3. $100.00 The four phases of Emergency Management are: • Response, Preparedness, Mitigation, Relaxation • Mitigation, Protection, Preparedness, Response • Response, Recovery, Mitigation, Preparedness • Response, Recovery, Reapply, Postpone

  4. $200.00 Who is the current acting FEMA administrator:

  5. $200.00 Who is the current acting FEMA administrator: • Nancy Ward • Jan Odeshoo • Sima Merrick • Karen Armes

  6. $1000.00 When conducting a Preliminary Damage Assessment, the Four categories include:

  7. $1000.00 When conducting a Preliminary Damage Assessment, the Four categories include: • Affected, Minor, Major, Destroyed • Get over it, Its Bad, That is terrible, forget about moving back • Attacked, Minor, Major, Destroyed • Damage, Minor, Major Destroyed

  8. $2000.00 There must be a minimum of __________homes and/or Businesses with 40% uninsured damages

  9. $2000.00 There must be a minimum of __________homes and/or Businesses with 40% uninsured damages • 32 • 20 • 15 • 25

  10. $3000.00 VOAD stands for:

  11. $3000.00 VOAD stands for: • Voluntary Organizations Assembled for Disaster • Voluntary Organizations Active in Disaster • Victims Of Assuming Disaster • Volunteers Organized Around Dinner

  12. $5000.00 Mitigation Plans break the cycle of:

  13. $5000.00 Mitigation Plans break the cycle of: • Public Assistance • Town Hall Meetings • Insurance Pay outs • Disaster Damage

  14. $6000.00 Which one of the following is not an example of hazard mitigation?

  15. $6000.00 Which one of the following is not an example of hazard mitigation? 1) Buying flood insurance 2) Adopting and enforcing flood damage reduction regulations 3) Elevating a flood-prone structure 4) Drinking enough beers to survive an extended visit from your in-laws

  16. $7000.00 Mitigation is...

  17. $7000.00 Mitigation is... 1) the cornerstone of emergency management. 2) something fun to do on the weekends. 3) something lawyers do. 4) what the birds do when it gets cold in the winter.

  18. The End

More Related