□ Construction, MC & Comm. Schedule Interface

DESCRIPTION

□ Construction, MC & Comm. Schedule Interface. Interface Management by HHI. Interface Management by Exxon. M/C sch. (HHI). Comm. (EXXON). Construction (HHI). □ Plan for Schedule Preparation (DES). Input. Output. Commissioning Priority Sequence Methodology Lead time, resource.

1 / 3

Download Presentation

□ Construction, MC & Comm. Schedule Interface

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. □ Construction, MC & Comm. Schedule Interface Interface Management by HHI Interface Management by Exxon M/C sch. (HHI) Comm. (EXXON) Construction (HHI) □ Plan for Schedule Preparation (DES) Input Output Commissioning Priority Sequence Methodology Lead time, resource MC Priority Required MC Completion Date MCCL quantity Methodology 23-May Exxon 31-May Commissioning Schedule(Pre) 20-Jun Exxon Actual Status (completed q’ty, actual date) Sequence Change Etc. Schedule Review & Finalize(Rev.0) HHI 30-Jun MC Schedule(Pre) Exxon Review (Comm & MC sch. Link) Commissioning Schedule Resource Curve MC Priority Required MC Completion Date Manpower Plan HHI/Exxon MC, Commissioning Execution & Schedule Control Basis of Schedule Mechanical Completion Schedule MCCL quantity Curve Manpower Plan Execution Plan Forecasting Schedule S-Curve Rebaseline Schedule etc

  2. □ WBS(Work Breakdown Structure) Level-1 (Module) Level-2 (System) Level-3 (Sub-Sys) Level-4 (Stage) Level-5 (Discipline)

  3. □ Activity ID □ - □ □ □ - □ □ □ - □ - □ Module System Sub-System Stage Discipline □ Level of Schedule Module Module Module System System Sub-System Stage Stage Stage Discipline [Level-1] [Level-2] [Level-3]