An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CHEE 470 Costing & Design

  2. Agenda • Introduce Myself • Discuss What You Want to Get Out of the Course • Discuss Project Planning / Design • Capital Cost Estimating Overview • Present Simulation Rationalization • Show the BLEVE Video

  3. Introduction • Dave Mody • david.m.mody@can.dupont.com

  4. Introduction • THE COURSE, WHAT’S IN IT FOR YOU?

  5. Project Planning / Design • Comments from Previous Years • Would like a piece of the plant that we could apply our own creative design skills • Reactor Section • Didn’t have a sense of how the design steps fit together until the end • Project planning assignment

  6. Project Planning / Design • Goal • Decide if it makes sense to build this process • technologically • economically • safety / environmentally • Why Consider It? • Need for low cost fuel source to Fuel Cells

  7. Project Planning / Design • Project Planning Assignment • You decide on a course of action • You identify new skills you think you need • You communicate those needs for integration into the lectures - e-mail me • Objective • put you in control of what you learn • focus lectures more to your needs • help you understand the ‘big picture’

  8. Project Planning / Design • Lectures • ESTIMATOR & CAPCOST - • Simplifies the design process :) :( • Content aimed at that required by ESTIMATOR • Augmenting the minimum information required by ESTIMATOR with relevant information to a practicing engineer • PROCESS SAFETY IN DESIGN

  9. Capital Cost Estimating Overview

  10. Simulation Rationalisation

  11. PROCESS SAFETY • Many Design Decisions Affect Process Safety • Difficult For People to Imagine the Consequences of Hazardous Events • Videos to help gain this experience • BLEVE and BLEVE 2 • Flixborough • Bohpal

  12. B.L.E.V.E Movie (Thing to Note as you watch) • BLEVE • Fireman on ladder • Incredible destructive power of a process vessel when it catastrophically fails • Fireball (heat, secondary fires), Blast wave, missiles • Try to get a sense of the distances involved for different size explosions

  13. B.L.E.V.E Movie (Thing to Note as you watch) • BLEVE 2 (update) • Ground shock when the propane tank bleve’s • Protection (controls, insulation)

  14. The End