P802.11z report to EC on request for conditional approval to proceed to RevCom

P802.11z report to EC on request for conditional approval to proceed to RevCom. Date: 2010-07-12. Authors:. Introduction. This document contains the report to the IEEE 802 Executive Committee in support of a request for conditional approval to send IEEE P802.11z to RevCom.

Download Presentation

P802.11z report to EC on request for conditional approval to proceed to RevCom

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. P802.11z report to EC on request for conditional approval to proceed to RevCom Date: 2010-07-12 Authors: M. Wentink (Qualcomm), B.Kraemer (Marvell)

  2. Introduction • This document contains the report to the IEEE 802 Executive Committee in support of a request for conditional approval to send IEEE P802.11z to RevCom. • This document (11-10/0854r3) was approved during the closing plenary session of the 802.11 working group on July 16, 2010. • Passed in the Task Group 11-0-0 M. Wentink (Qualcomm), B.Kraemer (Marvell)

  3. IEEE 802 Sponsor Ballot Results – P802.11z D9.0a includes post ballot vote changes received via email. M. Wentink (Qualcomm), B.Kraemer (Marvell)

  4. Comments by Ballot – P802.11z M. Wentink (Qualcomm), B.Kraemer (Marvell)

  5. Unsatisfied Comments by Commenter *Assumed unsatisfied, no response to repeated e-mails to commenter M. Wentink (Qualcomm), B.Kraemer (Marvell)

  6. Mandatory coordination M. Wentink (Qualcomm), B.Kraemer (Marvell)

  7. Unsatisfied Comments – Topics M. Wentink (Qualcomm), B.Kraemer (Marvell)

  8. Unsatisfied comments • The composite of all unsatisfied comments and the resolutions approved by the ballot resolution committee during sponsor ballot is attached. • Double click on the icon to the right to open this. • A copy of the unsatisfied comments presented using MyBallot access database report format is attached. • Double click on the icon to the right to open this. M. Wentink (Qualcomm), B.Kraemer (Marvell)

  9. TGz Timeline July 2010 M. Wentink (Qualcomm), B.Kraemer (Marvell) Slide 9

  10. 802.11 EC Motion – Conditional Approval to send P802.11z to RevCom Request the IEEE 802 Executive Committee for conditional approval to forward P802.11z D10.0 to RevCom. P802.11z had a 97% approval on the last Recirculation Sponsor Ballot, including post ballot vote changes. There are 4 disapprove voters, and 27 unsatisfied comments. CRC vote on the Motion Passed: 12 y, 0 n, 0 a Moved: Bruce Kraemer Second: <tbd> Yes No Abstain M. Wentink (Qualcomm), B.Kraemer (Marvell)

  11. Key • Key: • Coordination: comment supplied by a Mandatory coordination entity • Not Required: comment indicated as not required to satisfy voter • Satisfied: comment required to satisfy voter that is indicated as satisfied either by the voter indicating satisfaction with the specific comment, or by voting yes in a subsequent ballot • Known Unsatisfied: a comment that is indicated to be “required” by the voter, and the voter is maintaining a “no” vote, and the voter has indicated they are unsatisfied with the comment resolution. • Assumed Unsatisfied: comment not meeting any of the above criteria – i.e., a comment that is indicated to be “required” by the voter, and the voter is maintaining a “no” vote, and the voter has not responded when asked about their satisfaction with the comment resolution. M. Wentink (Qualcomm), B.Kraemer (Marvell)