An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Reverse Osmosis Water Plant Mr. Nafez Husseini, Chief Technology & Telecom Officer Consolidated Contractors CO. CCC

  2. Project Background • Gaza suffers from a shortage of clean and good conditioned water • Main sources of water in Gaza is from local wells and Israel Water Authorities (MAKAROT) • Target production capacity of 2 million m3 per year • Dispatched through main distribution network of the PWA

  3. Proposed Strategy • Development of a RO sea water plant in Gaza • Plant to be located within GPGC’s property • GPGC to manage and operate the plant • Fuel to be Diesel (Years 1-3) then Gas (Years 4+) • Project to be on a 20-year BOT basis • Selling price to be competitive with current sources

  4. Strategic Advantages • Supply of good quality water to the Palestinian people • Development of sustainable and independent Palestinian utilities sector • Utilizing GPGC’s economies of scale improves efficiency

  5. Financial Overview Preliminary Model Assumptions • Development Cost: ~ $9 million • Annual Operating Costs: • Years 1 – 3: ~ $1.3 million • Years 4+: ~ $1.0 million • Estimated Market Share: 3 – 4 % • Expected IRR: 18 %