1 / 13

MCF Robot

MODERN COACH FACTORY. MANUFACTURE OF METRO COACHES BY MCF. MCF Robot. MCF. MODERN COACH FACTORY. MCF OVERVIEW. Administrative Building. N. S. Township. MCF. MODERN COACH FACTORY. MCF – Transforming Steel to Speed. Year Wise Production Ramp-up

yoo
Download Presentation

MCF Robot

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MODERN COACH FACTORY MANUFACTURE OF METRO COACHES BY MCF MCF Robot MCF

  2. MODERN COACH FACTORY MCF OVERVIEW Administrative Building N S Township MCF

  3. MODERN COACH FACTORY MCF – Transforming Steel to Speed • Year Wise Production Ramp-up • 2007 - Foundation stone for 1000 LHB/year • Apr, 2011 First LHB coach furnished • Aug 2014 First LHB Coach Manufactured • Since 2014 Exponential Growth SHELL FROM RCF/KXH FULLY MFG. AT MCF/RBL MCF

  4. MODERN COACH FACTORY MCF – Transforming Steel to Speed • Nov , 2016 1st Humsafar Rake • April, 2017 1st Antyodaya Rake • Jan , 2018 1st Deen Dayalu Coach • June, 2018 1st SMART Coach • Oct, 2018 1st SMART Power Car • 11th Jan,2019 1st LHB Underslung Power Car • 29th Jan,2019 1st AC Pantry Car • 30th Jan,2019 1st TRC • 22 Feb, 2019 1st Non AC Chair Car • 2018-19 1425 Coaches MCF

  5. MODERN COACH FACTORY MCF – Transforming Steel to Speed • State of the Art infrastructure with flexibility to take up all variants of coach production: • Robotic Shell and Bogie manufacturing lines • Automated Wheel set line • CNC Bogie frame machining centre, plate/ sheet cutting and forming machines • Advanced Paint shop • A well laid out Furnishing and Finishing shops • Adoption of EN/ISO standards • AAA Quality with Bureau Veritas • Industry 4.0 MCF

  6. MODERN COACH FACTORY MCF – Transforming Steel to Speed • Infrastructure is being further augmented and upgraded • Capacity augmentation (up to 2000 coaches & then Ramp up production from 2000 to 5000 coaches) • Capability for Self-propelled coach manufacture • Aluminium coach production • Automated Bogie assembly line • linking of Design office to production (CAD-CAM) • Implementation of Industry 4.0 • Setting up of MCF Rail Ancillary Park MCF

  7. MODERN COACH FACTORY • Certifications MCF

  8. MODERN COACH FACTORY ADVANCE DESIGN CAPABILITIES • 3 Verticals in Design- Shell, Bogie and Interiors • 26 Workstations with NX-11.0 & PLM software, FEA & Ergonomic analysis, Electrical cabling etc. • EN/ISO Standards • Work in progress for • Train/coach Dynamic simulation (SIMPACK Multibody simulation(Rail vehicle) software • LS-DYNA & Hyper works (Dynamic Crash Analysis) • Virtual Reality-Setup • IETM (Interactive Electronic Technical Manual) MCF

  9. MODERN COACH FACTORY Training & skill development • TTC has been developed as Centre of excellence for training & Skill development- • Robotic Welding / operations & programming • Mechatronics and Automation lab MCF

  10. MODERN COACH FACTORY Manufacture of Metro coaches by MCF • Para no.- 8 of CRB’s inspection note of RDSO on 02nd Jun’ 2018 (letter no.2018/CRB/TP/48 dated 06.06.2018 ). • RDSO should formulate a strategy for IR coach manufacturing units trying to enter in to Metro business. • Strategy paper Report no. UTHS-03 (July,2018 ) submitted vide DG/RDSO letter no. UTHS/117 dated 16.07.2018 recommends manufacture of Metros by PUs. MCF

  11. MODERN COACH FACTORY Manufacture of Metro coaches by MCF • Manufacture of MEMUs- 240 nos • 240 coaches (15 rakes) planned in 2019-20. • Target for 1st Rake Nov, 2019. • Manufacture of Kolkata Metro (BG Metro)- • Order for 4 Rakes (4 x 6 = 24 coaches ). • Layouts sent to Kolkata Metro for approval • Planned in 2019-20. • Manufacture of Kolkata Metro (SG Metro)- • Order for 3 Rakes (3 x 6 = 18 coaches ). • Layouts sent to Kolkata Metro for approval • Planned in 2019-20. • TOT for Aluminium body coaches- • Metro on Aluminum shell as well MCF

  12. MODERN COACH FACTORY WHY MCF ? • State of the Art infrastructure : • Most modern Plant with more than 50 Robots and • Automatic Robotic manufacturing lines : Shell , Bogie, Wheel and Painting lines. • Excellent Design capabilities • Adoption of EN/ISO standards • AAA Quality with Bureau Veritas – maintaining superior quality standards • Industry 4.0 • Exponential growth in production- Spare capacity • Lower manufacturing cost • Manufacture of New generation MEMU • Metro coaches (BG & SG) for Kolkata Metro in 2019-20 • Aluminium Body coach manufacture- Metro • IRIS certification including Design • Looking forward for Metro orders MCF

  13. MODERN COACH FACTORY Thank You !

More Related