Features. Factory to be situated at Pune Raw material imported from China,Belgium and Australia Transportation cost comprises 2 components Fixed Variable. Distance Chart. Material required for-. Tyres: 20 kg Sheet Metal: 50 kg Fibre: 20 kg Wires: 10 kg Glass: 5 kg Auto-parts: 20 kg

yanka
Download Presentation

Features

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Features • Factory to be situated at Pune • Raw material imported from China,Belgium and Australia • Transportation cost comprises 2 components • Fixed • Variable

  2. Distance Chart

  3. Material required for- • Tyres: 20 kg • Sheet Metal: 50 kg • Fibre: 20 kg • Wires: 10 kg • Glass: 5 kg • Auto-parts: 20 kg • Paint: 5 kg • Aluminum: 20 kg

  4. Assumptions • Prices and availability of resources will be changed randomly in 5 min. • Selling price:- Rs 80,000 per byke • Material cost(including transportation cost):-40,000 per byke • Total weight of the byke:- 150kg

  5. Capacity • Truck:- 5 tons • Goods Train:- 20 tons • Ship:- 10 tons

  6. Rate per km • Truck :- 12 per km • Ship:- 15 per km • Goods Train:- 9 per km

  7. Means of transportaion

  8. Materials Available

  9. Cost