1 / 11

Thursday, 1-24-13 at Hinkle Fieldhouse

Indiana Subcontractor Association (ISA) and TURNER Butler Hinkle Fieldhouse Renovation project rollout . Thursday, 1-24-13 at Hinkle Fieldhouse. Project Team Introductions. Butler University: Barry Collier – Athletic Director Craig Hardee – Project Manager

xue
Download Presentation

Thursday, 1-24-13 at Hinkle Fieldhouse

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Indiana Subcontractor Association (ISA) and TURNERButler Hinkle Fieldhouse Renovation project rollout Thursday, 1-24-13 at Hinkle Fieldhouse

  2. Project Team Introductions • Butler University: • Barry Collier – Athletic Director • Craig Hardee – Project Manager • Rich Michal – Director of Facilities • Amanda Duenges – Engineering manager

  3. Project Team Introductions • Architect/ Engineer: • Brock Roseberry – Ratio Architects Associate • Tom Durkin – DVPE Mechanical Engineer • Al Villalta – DVPE Electrical Engineer • David Lach – Cripe Civil Engineer • Victoria Emery – Arsee Structural Engineer

  4. Project Team Introductions • Construction Manager • Bob Bursack – Project Executive • Tom Schmitt – Chief Estimator • Jeff Johnson – Project Superintendent • Milaina Thompson – Project Engineer

  5. Project Background • The historic Hinkle Fieldhouse is home to Butler Bulldog basketball, as well as other division 1 sports and with the recent success in national basketball tournaments has decided to renovate most of the fieldhouse locker rooms, athletic offices, concessions, alumni club, weight room, sports medicine facilities, restrooms, etc. Hinkle Fieldhouse was originally built in 1928.

  6. Project Goal • For Butler University Athletics to upgrade most of the athletic and classroom areas in Hinkle Fieldhouse. The Fieldhouse is home to BB, VB, football, baseball, softball, golf, tennis and campus PE. Butler athletics is committed to keeping the original aesthetic look while improving areas. The renovation will enhance 1) The student athlete experience and building life and 2) The fan experience and athletic office improvements.

  7. Contractor/ Supplier information • Safety program highlights • Turner prequal requirements process • Safety program/ Procedures manual review • LEED silver accredidation goal • Diversity goals • Site/ Interior phasing and logistics

  8. Site logistics

  9. Phasing Plan • (insert)

  10. Bidding scope and schedule • BG1 – demolition, concrete, steel, elevator, site utilities – distribute 1-23-13, bid 2-14-13 • BG2 – Arch, MEPFP, interior selective demolition – distribute 2-5-13, bid 2-28-13 • Grade beam distribution system for bid invitation and bid form/scope of work • Invited bid list • Plan copy shop available - Reprographics • Planned addendums

  11. Project summary schedule