1 / 22

ARUNACHAL PRADESH AWP&B 2013-14 (SSA-RTE) Project Approval Board Meeting 10th April 2013

ARUNACHAL PRADESH AWP&B 2013-14 (SSA-RTE) Project Approval Board Meeting 10th April 2013. State Facts. Area : 83,743 Sq km Shares international boundaries with Bhutan (160 km) China (1080 km) and Myanmar (440 km) Population : 13.82 lakhs (2011)

xia
Download Presentation

ARUNACHAL PRADESH AWP&B 2013-14 (SSA-RTE) Project Approval Board Meeting 10th April 2013

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ARUNACHAL PRADESH AWP&B 2013-14 (SSA-RTE) Project Approval Board Meeting 10th April 2013

  2. State Facts • Area : 83,743 Sq km • Shares international boundaries with Bhutan (160 km) China (1080 km) and Myanmar (440 km) • Population : 13.82 lakhs (2011) • Population Density : 17 persons/sq.km • No. of habitations : 5602 • Sex ratio : 920 females/1000 males • Literacy rate : 07.23% (1961) : 20.79% (1981) : 41.59% (1991) : 54.74% (2001) : 66.95% (2011)

  3. Towards achievement of SSA goals Increase of Elementary schools

  4. Progress in Major Educational Indicators : 2012-13 Source : UDISE 2012-13

  5. Reduction in Out of school Children Total child population: 336769

  6. District wise un-covered habitations (Primary)

  7. District wise un-covered habitations (Upper Primary)

  8. Annual Work Plan & Budget 2012-13 IMPLEMENTATION -REVIEW

  9. PAB Approval for 2012-13

  10. Release of Grants by GOI & State

  11. Financial Status for 2012-13 Report as on 31/03/13

  12. PROPOSALS for 2013-14 ISSUES

  13. 1. ACCESS: • The proposal for up-gradation of 49 EGS to PS has been recommended by TSG subject to re-appropriation of schools already sanctioned but not opened so far. • But the earlier sanctioned PS cannot be re-appropriated since the fund no longer exists for the purpose. • The proposal for upgrading 49 EGS to PS is based on the plan to mainstream students of existing EGS centres to regular schools. • PAB is requested to approve fund for up-gradation of 49 EGS to PS.

  14. 2. OUT OF SCHOOL CHILDREN • TSG has reduced the unit cost per OOS child from Rs.20000/- to Rs.16150/- for RST and from Rs.6000 to Rs.4050 for NRST. • The State seeks approval for per child rate as proposed by it below : • Rs.20000/- for RSTC • Rs.6000/- for NRSTC

  15. 2.1. RST BREAK-UP A centre wise break-up of activity wise expenditure has been worked out for 20 children @ ₹ 20,000/- per child per annum. Contd/-

  16. 2.2. NRST BREAK-UP A centre wise break-up of activity wise expenditure has been worked out for 20 children @ ₹ 6,000/- per chid per annum. Contd/-

  17. 3. Grants for BRC & CRC • The following grants for BRC/CRC needs to be approved: • Meeting/T.A Grant for BRCs/CRCs. • Salaries for Resource Persons (subject specific and CWSN), MIS coordinators, Data Entry Operators, Accountants cum support staff , CRC coordinators.

  18. 4. Re-appropriation of funds from General Head to Capital Head (2012-13 PAB is requested to approve for re-appropriation of funds from General Head to Capital Head as proposed above.

  19. 5.Reimbursement of fee against 25% seats in private schools • As per RTE Rules, the State has notified the 25% reservation of seats for children from weaker sections/ other disadvantaged groups. • The GOI is requested to provide fund for rei-mbursement to private schools for the same

  20. Thanks