An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Credit(s) earned on completion of this course will be reported to AIA CES for AIA members. Certificates of Completion for both AIA members and non-AIA members are available upon request. This course is registered with AIA CES for continuing professional education. As such, it does not include content that may be deemed or construed to be an approval or endorsement by the AIA of any material of construction or any method or manner ofhandling, using, distributing, or dealing in any material or product. ___________________________________________ Questions related to specific materials, methods, and services will be addressed at the conclusion of this presentation.

  2. Course Description The State of Iowa has adopted the 2012 International Energy Conservation Code, we will look at the 2012 IECC and how the code impacts the commercial building envelope.

  3. Learning Objectives At the end of the this course, participants will be able to: • 1.The participant will be able to identify the climate zone for the project location and choose the path of compliance that is appropriate with their design. • 2. The 2012 International Energy Conservation Code will be compared to the 2009 and how they impact the building envelope. • 3. Misconceptions, pitfalls and missed information critical to a complete COMcheck will be discussed. We will expolore presenters experience with COMcheck reviews over the past four years as well as details that need to be updated.

  4. IECC 2012 Commercial Energy code updateCommercial Envelope Statewide Code Compliance June 1st 2014

  5. Introduction David Ruffcorn, AIA Design/Energy Engineer Iowa State Fire Marshal’s Office Building Code Bureau

  6. Commercial Energy Code Summary • Energy Codes 101 • Paths of compliance • Increased prescriptive insulation requirements – Table C402.2 • Manual daylighting controls for buildings seeking 30% < WWR ≤ 40%; • Skylights/daylighting for large (>10,000 ft2) spaces w/ tall (15’) ceilings; • Continuous air barrier requirement for most buildings – Mandatory • Hints for compliance • Details – We can do better!

  7. Resources www.energycodes.gov www.buildingscience.com www.iccsafe.org Published by: International Codes Council

  8. 100,000 CF Statement 11 Review required by an Architect or Engineer Review Required. The plans and specifications for all buildings to be constructed which exceed a total volume of 100,000 cubic feet of enclosed space that is heated or cooled shall be reviewed by a registered architect or licensed professional engineer for compliance with applicable energy efficiency standards. • Statewide Code Compliance June 1st 2014

  9. IECC Compliance - Two Climate Zones • Iowa Has Two Climate Zones • Zone 5 • Zone 6

  10. Prescriptive R-values Table R402.1.1 Table C402.2 IECC Compliance - Three Options Simulated Performance (software) U-Factor and “UA” Alternatives U-factor R402.1.3 - REScheck C402.3 - COMcheck Simulated Performance Alternative R405 - REMrate C407 – DOE II • There are three paths of Compliance • Prescriptive • Trade-off • Performance

  11. Structure of the 2012 IECC Commercial Section Residential Section Ch. 1 R101 - Scope and Application /Administrative and Enforcement Ch. 2 R201 - Definitions Ch. 3 R301 - General Requirements Ch. 4 R401 - Residential Energy Efficiency Ch. 5 R501 - Referenced Standards Index Ch. 1 C101 - Scope and Application / Administrative and Enforcement Ch. 2 C201 - Definitions Ch. 3 C301 - General Requirements Ch. 4 C401 - Commercial Energy Efficiency Ch. 5 C501 - Referenced Standards Index

  12. Building Types C 101.4 - Applicability – What is NOT covered under this code: • C101.4.1 - Historic Buildings – State, National or Local historic property • C101.4.3 – Exceptions for Additions, Alterations, Renovations or Repairs • Exceptions – 1 to 8 • C101.4.6 – Mixed occupancy – Where the building is covered by the IECC Residential Provisions • C101.5.2 – Low Energy Buildings – with energy use below 3.4 Btu/h Sf of floor area for space conditioning purposes.

  13. Building Types C101.4.3 – Exceptions for Additions, Alterations, Renovations or Repairs

  14. Structure of the 2012 IECC Commercial Energy Efficiency Chapter 4 (CE)

  15. Conditioned space Building Envelope • Building Envelope consists of: • Fenestration • Ceilings • Walls • Above grade • Below grade • Mass walls • Floors • Slab • Crawl space

  16. 2012 Commercial IECCMandatory Requirements Mandatory Sections Regardless of Compliance Path • C402.4 Air Leakage – With sections C402.4.1 through C402.4.8 • Typo on C402.4.1.1 paragraph 3 recessed lighting fixtures shall comply with section C402.4.8 • C403.2 Provisions applicable to all mechanical systems – With sections C403.2.1 through C403.2.11 • C404 Service Water Heating – With sections C404.1 through 404.7.3 • Cont…..

  17. 2012 Commercial IECCMandatory Requirements Mandatory Sections Regardless of Compliance Path • C405 Electrical Power and Lighting Systems – With Mandatory Sections • C405.2 Lighting controls – With sections C405.2.1, C405.2.2, C405.2.3 and C405.2.4 • C405.3 Tandom Wiring • C405.4 Exit Signs • C405.6 Exterior Lighting • C405.7 Electrical Energy Consumption – Multi-Family • C 408 Commissioning • Mandatory from section C403.2.9

  18. 2012 Commercial Insulation and Fenestration by Climate Zone - Prescriptive • Table C402.2

  19. 2012 Commercial Insulation and Fenestration by Climate Zone - Prescriptive • Table C402.3

  20. 2012 Commercial Compliance Approach Trade-off Method Use when the envelope assemblies don’t fit in the prescriptive table • Works for 95% of all projects • Trades off over insulated areas for under-insulated areas • Free and simple program • Tied to table C402.2

  21. 2012 Commercial Compliance Approach Trade-off Method • Don’t try to calculate the assembly U-value • COMcheck does this MUCH better!

  22. 2012 Commercial Compliance Approach Performance Method • State Requirements for Performance Energy Modeling • Department of Energy DOEII – Energy Modeling Engine Software • Free and simple programs, Energy Plus, eQUEST, EPquick • OpenStudio Etc. • The International Energy Conservation Code 2012 Section C407 outlines the Total Building Performance Method and ASHRAE 90.1 2010, Section 11.1 outlines the Energy Cost Budget Method. ASHRAE 90.1 2010 Appendix G can be used in specific circumstances but each project will need to be approved before using this method. The preferred method in Iowa is the ASHRAE 90.1 2007 Energy Cost Budget Method, the other methods can be used, only with prior approval.

  23. Vertical Fenestration Requirement C402.3.1 – Prescriptive (Max area) Percentage of Vertical Fenestration Area to Gross Wall Area • Allowed up to 30% maximum of above grade wall • In Climate Zones 1-6, up to 40% maximum of above grade wall with daylighting controls

  24. Increased Vertical Fenestration with Daylighting Controls – Prescriptive C402.3.1.1 • Up to 40% vertical fenestration area allowed in Climate zones 1-6, provided • No less than 50% of the conditioned floor area is within a daylight zone • Automatic daylighting controls are installed in daylight zones; and • Visual Transmittance of vertical fenestration is ≥ 1.1 times SHGC Exception: Fenestration that is outside the scope of NFRC 200 isn’t requiredto comply with VT

  25. Skylight Minimum Fenestration Area C402.3.1.2 Prescriptive • Limited to ≤ 3% of Roof Area • Up to 5% allowed if automatic daylighting controls installed in daylight zones under skylights

  26. Minimum Skylight Fenestration AreaC402.3.2 – Prescriptive • In certain types of enclosed spaces > 10,000 ft2 directly under a roof with ceiling heights > 15 ft • total daylight zone under skylights to not be < ½ the floor area and to provide a minimum skylight area to daylight zone of either • Minimum of 3% of roof area with a skylight VLT at least 0.40 OR • Provide a minimum skylight effective aperture of at least 1% Exceptions • Climate zones 6-8 • Spaces with LPDs < 0.5 W/ft2 • Documented shaded spaces • Daylight area under rooftop monitors is > 50% of floor area

  27. Lighting Controls in Daylight Zones –Under SkylightsC402.3.2.1 – Prescriptive • All lighting in the daylight zone shall be controlled by multilevel lighting controls that comply with C405.2.2.3.3 • Exceptions: • Climate zones 6-8 • Spaces with LPDs < 0.5 W/ft2 • Documented shaded spaces • Daylight area under rooftop monitors is > 50% of floor area

  28. Increased Skylight SHGC C402.3.3.3 • In Climate Zones 1-6, skylights above daylight zones with automated daylight controls are permitted a maximum SHGC of 0.60

  29. Increased Skylight U-Factor C402.3.3.4 – Prescriptive • Skylights above daylight zones with automated daylight controls are permitted a maximum U-factor of • 0.9 in Climate Zones 1-3 • 0.75 in Climate Zones 4-8

  30. New and Improved!!! And required regardless of compliance path! Air Barriers and Construction C402.4.1 and C402.4.1.1 – (Mandatory)

  31. Air Barriers and Construction C402.4.1 and C402.4.1.1 - Mandatory Continuous air barrier required in: • Iowa’s climate zones 5 & 6 Air barrier requirements: • Placement allowed • Inside of building envelope • Outside of building envelope • Located within assemblies composing envelope OR • Any combination thereof • Continuous for all assemblies part of the thermal envelope and across joints and assemblies • Joints and seams to be sealed per C402.4.2 • Recessed lighting to comply with C404.2.8. • Where similar objects are installed that penetrate the air barrier, make provisions to maintain the air barrier’s integrity

  32. Air Barrier Compliance Options C402.4.1.2 -Mandatory Three ways to comply with air barrier requirements • Materials • Assemblies • Building

  33. Air Barrier Materials (Compliance) C402.4.1.2.1 -Mandatory Materials with air permeance ≤ 0.004 cfm/ft2 under pressure differential of 0.3 in. w.g. tested in accordance with ASTM E 2178 These materials meet this requirement:

  34. Air Barrier Assemblies (Compliance) C402.4.1.2.2 OR Assemblies of materials and components (sealants, tapes, etc.) with average air leakage ≤ 0.04 cfm/ft2 under pressure differential of 0.3 in. w.g. tested in accordance with ASTM E 2357, 1677 or 283 These assemblies meet this requirement: • Concrete masonry walls coated with one application either of block fillerand two applications of a paint or sealer coating OR • Portland cement/sand parge, stucco or plaster minimum ½ thick

  35. Air Barrier Building Test (Compliance) C402.4.1.2.3 OR Air leakage rate of completed building tested and confirmed to not exceed 0.40 cfm/ft2 at a pressure differential of 0.3 inches water gauge per ASTM E779 or equivalent method approved by code official

  36. Air Leakage C402.4.2 to C402.4.8 ( Mandatory) • C402.4.2 Air Barrier Penetrations • Penetrations of the air barrier and paths of air leakage shall be caulked, gasketed or otherwise sealed. • C402.4.3 Air Leakage of Fenestration • Shall meet Table C402.4.3 and tested to referenced standard. • C402.4.4 Doors and Access Openings to Shafts, Stairways etc. • Shall meet either C402.4.3 or shall be gasketed, weather stripped or sealed • C402.4.5 Air Intakes, Exhausts, Stairways and Shafts • Shall be provided with dampers in accordance with C402.4.5.1 &2 • C402.4.6 Loading Dock Weatherseals • C402.4.7 Vestibules • Required from a space 3,000 Sfin areaor more. • C402.4.8 Recessed Lighting • All recessed luminaires shall be IC-rated and labeled as having a leakage rate of not more than 2.0 cfm@75 Pa

  37. Additional Efficiency Requirements - Prescriptive • One Additional Efficiency Feature Must Be Selected to Comply with the IECC • More efficient lighting system (consistent with 90.1-2010), or • More efficient HVAC system • Installation of onsite renewables • 3% of the regulated energy • High Efficiency HVAC More Efficient Lighting System • Onsite Renewables

  38. Energy Code Plan ReviewWhat you need to know to pass the first time

  39. Plan Review Submittal - Hints • What’s needed to pass Energy Code Plan Review….. • Complete drawings, specifications and Energy Code documentation. • The drawings, specifications and Energy Code must contain the same information. Architectural and MEP must use same code. • Storefront windows and doors have different U-values so they must be specified in two locations. • Update your standard specification – Construction materials change over the years so should your specification. • COMcheck is only interested in the location and listed value of your insulation. Mechanical and Electric are really spread sheets. • The values listed in your COMcheck should be in the specification or drawings exactly as noted. • Update your standard details – We can do better!

  40. Specifications to Review • Specification Sections Always Under Review • Section 07 2100 Thermal Insulation • Section 07 5300 Elastomeric Membrane Roofing • Section 07 7200 Roofing Accessories • Section 08 4113 Aluminum-Framed Entrances and Storefronts • Section 08 4413 Glazed Aluminum Curtain Walls • Section 08 4523 Translucent Fiberglass Sandwich Panel • Section 23 0719 HVAC Pipe Insulation • Section 22 0719 Pipe Insulation

  41. Specifications to Review • Section 07 2100 Thermal Insulation • PART 2 PRODUCTS • 2.01 APPLICATIONS • A. Rigid Insulation Under Concrete Slabs: Extruded or expanded polystyrene board. • B. Rigid Insulation at Perimeter of Foundation: Extruded or expanded polystyrene board. • C. Rigid Insulation Inside Masonry Cavity Walls: Extruded or expanded polystyrene board. • 2.02 FOAM BOARD INSULATION MATERIALS • A. Extruded Polystyrene Board Insulation: ASTM C 578, Type IV; Extruded polystyrene board with either natural skin or cut cell surfaces; with the following characteristics: • 1. Flame Spread Index: 25 or less, when tested in accordance with ASTM E84. • 2. Smoke Developed Index: 450 or less, when tested in accordance with ASTM E84. • 3. Board Size: 48 x 96 inch. • 4. Board Thickness: As indicated

  42. Specifications to Review • Section 07 5300 Elastomeric Membrane Roofing • PART 2 PRODUCTS • 2.04 INSULATION • A. Polyisocyanurate Board Insulation: Rigid cellular foam, complying with ASTM C1289, Type II, Class 2, polymer bonded glass fiber mat both faces and with the following characteristics: • 1. Board Thickness: 1.5 inch. • 2. Board Edges: Square. • 3. Tapered Units: Provide factory-tapered insulation boards fabricated to slope of 1/4 inch per 12 inches unless otherwise indicated. • 4. Provide composite boards with oriented strand board laminated to one side in lieu of cover board when required by manufacturer to meet system warranty requirements.

  43. Specifications to Review • Section 07 7200 Roof Accessories • PART 2 PRODUCTS • 2.04 INSULATION • 2.02 ROOF HATCHES • A. Manufacturers - Roof Hatches: • 1. Basis-of-Design: Bilco Co., Enhanced Performance E-50T. • a. Subject to compliance with the specified requirements, provide the basis-of-design product or a comparable product approved by the Architect, prior to bid. • B. Roof Hatches: Factory-assembled steel frame and cover, complete with operating and release hardware. • 1. Style: Provide flat metal covers unless otherwise indicated. • 2. Mounting: Provide frames and curbs suitable for mounting on corrugated metal roof deck. • 3. Size: 36" x 36" • 4. Loads: Fabricate roof hatches to withstand 40-lbf/sq. ft. external and 20-lbf/sq. ft. internal loads. • C. Frames/Curbs: One-piece curb and frame with integral cap flashing to receive roof flashings; extended bottom flange to suit mounting. • 1. Material: Aluminum,.090 inch thick. • 2. Insulation: 2 inch thick polyisocyanurate board with R-value of 12. • 3. Interior Lid Liner: Manufacturer's standard metal liner of same material and finish as metal curt. • 4. Exterior Curb Liner: Manufacturer's standard metal liner of same material and finish as • metal curb. • 5. Curb Height: 12 inches from surface of roof deck, minimum.

  44. Specifications to Review • Section 08 1113 Aluminum-Framed Entrances and Storefronts • 1.02 Performance Requirements • A. General Performance: Aluminum-framed systems shall withstand the effects of the following • performance requirements without exceeding performance criteria or failure due to defective • manufacture, fabrication, installation, or other defects in construction: • 1. Movements of supporting structure indicated on Drawings including, but not limited to, • story drift and deflection from uniformly distributed and concentrated live loads. • 2. Dimensional tolerances of building frame and other adjacent construction. • 3. Failure includes the following: • a. Deflection exceeding specified limits. • b. Thermal stresses transferring to building structure. • c. Framing members transferring stresses, including those caused by thermal and • structural movements to glazing. • d. Noise or vibration created by wind and by thermal and structural movements. • e. Loosening or weakening of fasteners, attachments, and other components. • f. Failure of operating units. • B. Wind Loads: As indicated on Drawings. • C. Deflection of Framing Members: • 1. Deflection Parallel to Glazing Plane: Limited to L/360 of clear span or 1/8 inch, • whichever is smaller. • D. Air Infiltration: Provide aluminum-framed systems with maximum air leakage through fixed • glazing and framing areas of 0.06 cfm/sq. ft. of fixed wall area when tested according to • ASTM E 283 at a minimum static-air-pressure difference of 6.24 lbf/sq. ft. • E. Thermal Transmittance Test (Conductive U-Value) • 1. Test in accordance with NFRC-102. • 2. Conductive thermal transmittance fixed unit assembly (U-Value) shall not be more than 0.37 BTU/hr•ft²•ºF when glazed with 1 inch insulated - 1/4 inch clear low emissivity, 1/2 inch air, 1/4 inch • clear glass.

  45. Specifications to Review • Section 07 4523 Translucent Fiberglass Sandwich Panel • PART 2 PRODUCTS • 2.04 Panel Construction • A. Provide sandwich panels of flat fiberglass reinforced translucent face sheets laminated to a grid core of mechanically interlocking I-beams. The adhesive bonding line shall be straight, cover the entire width of the I-beam and have a neat, sharp edge. • 1. Thickness: 2-3/4” • 2. Light transmission: 12-15% • 3. Solar heat gain coefficient 0.18. • 4. Panel U-factor by NFRC certified laboratory: 2-3/4” thermally broken grid 0.14. • 5. Complete insulated panel system shall have NFRC certified U-factor of 0.20.