Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission. Particles and Fields Package Pre-Ship Review November 17, 2012 06: SMA Jorg Fischer, MAM. PSR SMA - Summary.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Particles and Fields Package Pre-Ship Review November 17, 2012 06: SMA Jorg Fischer, MAM' - xena


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1

Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission

Particles and Fields Package

Pre-Ship Review

November 17, 2012

06: SMA

Jorg Fischer, MAM

psr sma summary
PSR SMA - Summary

EIDP (including GSFC, IRAP) flight travel books have been reviewed, all open items are identified by SSL and GSFC and are tracked.

Configuration Control- no issues

Parts or materials – no issues

Hardware and Software – no issues - Exception: SWEA

No major issues during built-up – Exception: SWEA

No major non-compliance exists – Exception: SWEA

NCR/PFR: Jorg Fischer

Testing and Verification: David Curtis

Software code Status & GSE: Peter Harvey

SSL Safety: Jorg Fischer, Safety: LM

pfr ecn waiver mua overview
PFR, ECN, Waiver, MUA Overview

Anomalies/PFR/NCR

38 NCRs and 84 PFRs issued – All closed or in closing process

(3) in monitoring process - STATUS next slides

ECN/ECO

18 ECN/ECO issued, All closed

WAIVERS, CCR

18 Configuration Changes issued – all closed, confirmed

23 Waivers/Deviations issued

– all closed – 1 to be confirmed by GSFC

MUA

5 MUAs issued, – all closed - to be confirmed by GSFC

SPR/SCR

Report by Peter Harvey – all closed

sma mrb
SMA - MRB
  • MRB System
  • PFR status report list sent to GSFC – weekly
  • PFR-NCR System will serve as a Lessons Learned System
  • Provided assistance to SSL engineers with PFR documentation and related item close-out
sma mrb1
SMA - MRB

Anomalies/PFR/NCR – STATUS of five (5) open PFRs

PFR 105,   EUV Temp Sensor Noise is open – LASP EUV

- in closing process (document scans needed)

PFR 119,  STATIC TOF Field Emission Noise -

- SSL is working to close (document scans needed)

PFR 124, LASP LPW Cold Anomaly – LASP EUV

- in closing process – Needs GSFC parts analysis

PFR 125, STATIC SWEEP VGRID Oscillation – Ready and working to close

PFR 127 SWEA Anode – open - WIP

sma observations
SMA – Observations

Concerns – All concerns are well understood and are closely monitored by the SSL and GSFC QA teams.

Pending – Expect two red flag PFRs (SWEA PFR 059 and PFR 122) – LM monitoring for both. PFR 115: SWIA Vibration Frequency Shift – expected to close after vibe test

Shipping

UCB SSL SMA is ready to support shipping/delivery