1 / 4

Eco-Friendly Hobart Light Rail for Efficient Public Transit

Introducing a clean and green light rail system in Hobart for efficient public transport. Renovated single-line service with 10-15 minute frequency during peaks and integration with bus services and park-and-ride facilities. Enhanced reliability with electric traction and automatic signaling. Includes limited freight and tourist train services. Heritage trains run on Sundays. Objectives focus on improved accessibility and connectivity.

wren
Download Presentation

Eco-Friendly Hobart Light Rail for Efficient Public Transit

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Improved, clean/green public transport 10-15 minute frequency during peaks Integrate with bus services and park and ride facilities Single line working demands high reliability (electric traction) and automatic signalling Track maintained for limited freight and or tourist trains Heritage trains run a less demanding Sunday service Hobart Light Rail - Objectives

  2. Hobart Light RailOne (of many) running options NEW TOWN GLENORCHY CLAREMONT HOBART – MAWSON PLACE MOONAH ROYAL HOBART HOSPITAL? GRANTON     Disabled AccessBicycle AccessMetro Bus ConnectionPark & Ride FacilityCharging Station  

  3. Hobart Light RailOne (of many) running options NEW TOWN 6 min GLENORCHY 12 min CLAREMONT18 min HOBART – MAWSON PLACE MOONAH 9 min ROYAL HOBART HOSPITAL? GRANTON 24 min     • 4 light rail vehicles operating during peak periods • Around 12 minute interval between departures in each direction • 3 intermediate ‘passing stations’ • Hobart to Granton in around 24 minutes (top speed 65 km/h)

  4. Close proximity to CBD is essential Proposal (right) is an easy option and doesn’t involve cost prohibitive tunnelling Avoids delays due to lift/swing bridges Avoids sharp curves (permits access to occasional heritage/tourist rail vehicles) Hobart Light RailCity Terminus MAWSON PLACE or ARGYLE STREET

More Related