1 / 28

2 nd International BAUXITE RESIDUE VALORISATION AND BEST PRACTICES CONFERENCE, 7-10 May 2018

National Technical University of Athens School of Chemical Engineering. MINERAL ACID LEACHING OF SCANDIUM FROM BAUXITE RESIDUE. Maria OCHSENKUEHN-PETROPOULOU, Theopisti LYMPEROPOULOU, Lamprini-Areti TSAKANIKA, Klaus-Michael OCHSENKUEHN, Konstantinos HATZILYBERIS,

woody
Download Presentation

2 nd International BAUXITE RESIDUE VALORISATION AND BEST PRACTICES CONFERENCE, 7-10 May 2018

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. National Technical University of Athens School of Chemical Engineering • MINERAL ACID LEACHING OF SCANDIUM FROM BAUXITE RESIDUE Maria OCHSENKUEHN-PETROPOULOU, Theopisti LYMPEROPOULOU, Lamprini-Areti TSAKANIKA, Klaus-Michael OCHSENKUEHN, Konstantinos HATZILYBERIS, Paraskevas GEORGIOU, Chrysanthos STERGIOPOULOS and Fotios TSOPELAS 2nd International BAUXITE RESIDUE VALORISATION AND BEST PRACTICES CONFERENCE, 7-10 May 2018 Athens, 9 May 2018

  2. Bauxite Residue • Bauxite Residue or Red mud: A by-product of alumina production after Bayer process (~40-50 % Fe2O3) • Global production: 150 Mt/yr • Accumulated amount: 3 billion t • Annual production in Greece : 750.000 tons (AoG) • Characteristics: • Highly alkaline (pH>11) • Very fine grained • Rich in elements of techno-economical interest (V, Zr, Nb, REEs) • Enriched in REEs by a factor of 2 respectively to the original bauxite • Scandium comprises 98% of the total value of REEs in Greek BR • Full exploitation of BR in AoG can produce about 1 kt/yr of REE oxides

  3. Concentration [g/t] of Sc and REEs in Greek red mud batches(1993-2016) Results obtained by the Lab of Inorganic & Analytical Chemistry, School of Chemical Engineering NTUA • Sc main uses(critical metal for future) • Al-Sc alloys (high tech products [0.5-0.8%Sc] for aerospace, • defense technology, automobiles, athletic equipment) • SOFCs (as electrolyte, improving oxygen-ion conductivity)

  4. Ga, Nb, Zr, REEs and radioactive elements Th, U in BR (g/t BR 2014)

  5. Recovery of REEs from Red mud Lab scale – Pilot plan Bayer process Bauxite Alumina Bauxite Residue Mineral Acid Leaching HCl, HNO3, aqua regia, H2SO4 Individual REEs (Selective extraction/ RP-HPLC) Sc separation (Ion exchange)

  6. % leaching recovery

  7. Economics of Sc production Main cost categories throughout the stages of Sc2O3 production from BR: 1 total investment cost distributed within a lifetime of 25 years 2 labor, operating, maintenance cost & overheads Sc Production Cost Breakdown per processing stage

  8. Economics of leaching process • Most critical factor in operation: Reagents cost • Purchase cost ratio HNO3/H2SO4 at least 2:1 • Leaching agent: HNO3 • HNO3 cost ≈ 350 $/kg Sc2O3 (16-17% of total production unit cost of Sc2O3) • Leaching agent: H2SO4 • H2SO4 cost ≈ 140-150 $/kg Sc2O3 • Using H2SO4compresses leaching cost about 2.3 times

  9. Effect of leaching agent on Th, U, Ga, Zr and Nb recovery

  10. Leaching agents

  11. Optimization of leaching process with sulfuric acid • Investigated variables • Leaching time • Liquid to solid ratio (pulp density) • Acid molarity • Final pH • Temperature • Pressure • Multi stage leaching (re-leaching with fresh acid) • Leachate recycling (reusing of PLS on fresh BR)

  12. Effect of leaching time • L/S=1:20 (ambient conditions) Rapid reaction 5-60 min

  13. Effect of L/S ratio Critical on Sc concentration No significant effect on Sc recovery

  14. Effect of H2SO4 Molarity • Higher molarities (>3M): • no significant effect on Sc recovery, but enhance Fe dissolution • economical and environmental impact • no gel formation even at lower L/S ratios

  15. Effect of final pH Optimum pH range < 0 - 0.3 L/S=5,10,20 &1-3M H2SO4, 60 min, ambient conditions

  16. Effect of temperature and pressure Normal leaching conditions: L/S=10 (10%), 2M H2SO4, t=60min Extreme conditions: L/S=3.3 (30%), 2M H2SO4, t=420min, T=85oC Sc = 17ppm but Fe>30000 ppm and Ti>3400 ppm

  17. Concentration of main elements High pulp density leads to gel formation. The problem is solved by working with higher molarities.

  18. Multi stage effect(re-leaching with fresh acid) Leaching time t=60min, Ambient conditions

  19. Leachate recycling(reusing of PLS on fresh BR) Leaching conditions: L/S= 7.5 - 10 (13 – 10 %), 2M H2SO4, pH ~0, t=60min Ambient conditions

  20. One way ANOVA(three categorical – two dependent variables) Statistical evaluation

  21. Statistical evaluation • Contour plot of C100vsmolarity, ratio Contour plot of C100vs time, ratio

  22. Model for the theoretical prediction based on diffusion theory Symbols ηL/Sc : the efficiency of the leaching process regarding Sc, in mg of Sc in leachate /mg of Sc in leached sample of BR, (CSc)BR : the concentration of Sc in BR, expressed, in mg of Sc/kg of dry BR, (L/S)reactant ≈ (L/S)feed: the Liquid to Solids ratio , in L of acid/kg of dry BR, cs : the concentration (w/v) of the saturated solution in contact with the particles, in mg of Sc/L of acid, KL=k’/b, : the overall mass transfer coefficient from particles to the Liquid phase, where: k’ : the diffusion coefficient, in dm2/min b : the effective thickness of the liquid film surrounding the particles, in dm, S(=Atot/Md) : the specific surface area of BR particles participating in the leaching process, where: Atot : the total area of the solid-liquid interface, in dm2, Md : the total mass of dry BR particles, in kg, and τ : the mixing residence time, in min.

  23. Molarity: 1 M H2SO4 Statistical evaluation Model

  24. Development of flow-sheet forselective Sc leaching from BR The conceptual design for a continuous work • L=Leaching reactor. • P= Unit for Purification of leachate from solids. • M= Mixing unit. • BR= Bauxite Residue streams with moisture content. Subscripts:i = input (alkaline solids stream), o = output (acidic solids stream). • A= Acid streams (sulfuric acid solutions). Subscripts: f= leaching feed, p= product (PLS), n= new (fresh solution), r= recycling PLS, d= dense acid (93-98% w/w). • W= Water stream

  25. Conclusions (1/2) • Leaching time up to 60min. Fast process. Leaching time statistically significant for Sc recovery. • Low acid molarities (≈1M) are environmentally and economically favorable but result to gel formation due to Si compounds, especially for low L/S ratios. • Higher molarities (≈2-3M) increase Sc recovery, allow to work with lower L/S (or, higher pulp density) at the expense of selectivity and economical impact. • L/S (pulp density) crucially increases Sc concentration. High pulp density though, result to handling difficulty due to gel formation. • Final pH values are associated to acid molarity. Adjusting final pH value close to zero enhances Sc recovery.

  26. Conclusions (2/2) • Temperature and pressure effect seems insignificant for Sc recovery when using low acid molarity . • High temperatures combined with high molarities (>3M) improve Sc recovery , while selectivity is reduced (higher Fe concentrations). • Multi stage leaching improves Sc recovery . Iron recovery remains low. • PLS recycling with pH adjustment almost triples Sc concentration but affects the selectivity. • Combination of high molarity, high pulp density, elevated temperature, prolonged time and recycling lead to high Sc concentration in the PLS up to 30 ppm, but enhance iron concentration due to its almost total dissolution. • Most promising scenario for selective leaching under ambient conditions resulted till now in: 1-2M H2SO4,L/S=10, t=60 min, PLS recycling 1.5 times combined with pH adjustment.

  27. Acknowledgments • The research leading to these results has been performed within the SCALE “Production of Scandium compounds and Scandium Aluminium alloys from European metallurgical by-products”project and received funding from the European Community's Horizon 2020 Program (H2020/2014-2020), under Grant Agreement No. 730105. • The company II-VI is also gratefully acknowledged for the fruitful collaboration in a previous joint project.

  28. Thank you for your attention !