1 / 13

PUBLIC RESTROOMS IN PARKS

PUBLIC RESTROOMS IN PARKS. 1. ASSOCIATED STIGMAS 2. RESULTING ACTIONS 3. CORWORTH SOLUTIONS 4. DESIGN / COSTS 5. WHY CORWORTH?. 1. ASSOCIATED STIGMAS SANITARY CONCERNS. Hard To Clean Stink Unsanitary. 1. ASSOCIATED STIGMAS SAFETY CONCERNS. Poor Lighting Inviting To Predators

Download Presentation

PUBLIC RESTROOMS IN PARKS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PUBLIC RESTROOMS IN PARKS 1. ASSOCIATED STIGMAS 2. RESULTING ACTIONS 3. CORWORTH SOLUTIONS 4. DESIGN / COSTS 5. WHY CORWORTH?

  2. 1. ASSOCIATED STIGMASSANITARY CONCERNS • Hard To Clean • Stink • Unsanitary

  3. 1. ASSOCIATED STIGMAS SAFETY CONCERNS • Poor Lighting • Inviting To Predators • Securing After Hours • Site Construction

  4. 1. ASSOCIATED STIGMAS AESTHETIC CONCERNS • Unsightly • Poor Construction • Utilitarian • Bland

  5. 2. RESULTING ACTIONS • No Restrooms At All • Peeing In Bushes • Peeing In Pants • Lower Park Usage • Higher Chance Of Vandalism

  6. 3. CORWORTH SOLUTIONS EASY TO MAINTAIN • Epoxy Floor Finish • FRP Wall Finish • Wall Mount Fixtures • Central Utility Chase

  7. 3. CORWORTH SOLUTIONS FEATURES • 8,000 PSI Slab • Red Shield Coated Lumber • Continuous Door Hinge • Polycarbonate Louvers • Vandal-Resist LED Lighting

  8. 3. CORWORTH SOLUTIONS DESIGN • Sizing Per Usage, Not Acreage • Seismic Category D, 130 MPH Wind Load • Architectural Flexibility

  9. 3. CORWORTH SOLUTIONS CMS • CorWorth Management System (CMS) • Auto Water Sensor / Shutoff • Auto Door Locks • Lighting Control • After Hour Motion Alert • Customizable • Control / Receive Alerts Via Cell Phone, etc.

  10. 3. CORWORTH SOLUTIONS FAST INSTALL 4-5 Day Site Install

  11. 4. DESIGN / COSTS DESIGN • Model #W101 For Pocket Parks • 108 Square Feet • Epoxy Floor Finish • FRP Interior Wall Finish • Vitreous China Toilet & Sink • LED Lights • Hand Dryer • Open, Cathedral Ceiling • Composition Shingles

  12. 4. DESIGN / COSTS COSTS

  13. 5. WHY CORWORTH? • Our prefabricated restroom buildings add value to a park • We are the architect, engineer, builder, freight, crane & installer • Construction time is approximately 80 days after plan approvals • Life cycle of 40-50 with little maintenance to the building itself • Buildings carry a 5-year warranty • Safety and hygiene designed into each building • Vandalism, odors and substandard materials designed out of each building • Minimal disruption to the park during installation • Ability to design to each park theme • No fee preliminary design and consulting

More Related