AN-NAJAH NATIONAL UNIVERSITY BUILDING ENGINEERING DEPARTMENT Recreation Centre PREPARED BY:

AN-NAJAH NATIONAL UNIVERSITY BUILDING ENGINEERING DEPARTMENT Recreation Centre PREPARED BY: Bayan Hudhud Shayma ’ Aljurf Thekra Shehada Supervisor : Dr.Mo’ayad Salhab. Location. Site Analysis. Site Plan. Ground Floor Master Plan. First Floor Master Plan. Ground Floor furniture Plan.

wilda
Download Presentation

AN-NAJAH NATIONAL UNIVERSITY BUILDING ENGINEERING DEPARTMENT Recreation Centre PREPARED BY:

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AN-NAJAH NATIONAL UNIVERSITY BUILDING ENGINEERING DEPARTMENT Recreation Centre PREPARED BY: BayanHudhud Shayma’ Aljurf ThekraShehada Supervisor : Dr.Mo’ayadSalhab

  2. Location

  3. Site Analysis

  4. Site Plan

  5. Ground Floor Master Plan

  6. First Floor Master Plan

  7. Ground Floor furniture Plan Grnd Floor Master Plan

  8. First Floor furniture Plan

  9. Sections

  10. Elevations

  11. Elevations

  12. Climate Data In Nablus

  13. Environmental Analysis The Environmental Analysis has been mad by using the Autodesk Building Analysis Program (ECOTECT)

  14. Sun Path Sun Path In Sumner Solstice (21 June)

  15. Sun Path Sun Path In Winter Solstice (22 December )

  16. Natural Lighting for Swimming Pool

  17. Curtin Walls of the Swimming pool :

  18. Electrical Design

  19. Ground Floor Lighting System

  20. First Floor Lighting System

  21. Lamp Type

  22. Ground Floor Power System

  23. First Floor Power System

  24. Ground Floor Low Current and Fire Resisting System

  25. First Floor Low Current and Fire Resisting System

  26. Low Current System

  27. Fire Resisting System

  28. Fire Resisting System Extinguisher

  29. Main Board

  30. Main Board