The mB1 is a bracelet that connects to a cellular phone via Bluetooth technology to notify the user of incoming calls or text messages. This non-obtrusive indicator provides a convenient way to stay connected. Design milestones include ordering additional parts, completing hardware and software, and integrating the components. Ongoing tasks include hardware construction, Bluetooth programming, software development, and GUI implementation. Pending tasks include integration and finalizing the project report. The project schedule shows that the block diagram design is 100% complete, software is 35% complete, integration is at 0%, parts are 75% complete, and hardware is 15% complete.

wicker
Download Presentation

Status Report #6

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status Report #6 Antonio DeMendonca Albert Lopez Lourdes Alvarez Antony Acha October 17, 2011 mBrace Tech mB1 mB1 is a bracelet connected to a cellular phone via Bluetooth technology in order to alert its user of a phone call or text message.

  2. Overall Need Utilize available technology to realize that someone is trying to reach you through the ease of a non-obtrusive indicator on you personally. Design Milestones: Order Additional Parts • Completed Hardware / Software • Complete By: 10/24/2011 Integration • Complete By: 11/14/2011

  3. Ongoing / Pending Tasks Ongoing Tasks • Hardware construction • Bluetooth Programming • Software • GUI on Personal Computer Pending Tasks • Integration

  4. Recently Completed & Upcoming Tasks • Website Development – Completed • Remaining Parts - Completed • Integration • Final Report Draft

  5. Block Diagram Design 100% Software 35% Integration 0% Parts 75% Hardware 15%