wells
Uploaded by
13 SLIDES
416 VIEWS
140LIKES

DATA POKOK PENDIDIKAN DASAR 2013

DESCRIPTION

DATA POKOK PENDIDIKAN DASAR 2013. DIREKTORAT JENDERAL PENDIDIKAN DASAR KEMENTERIAN PENDIDIKAN DAN KEBUDAYAAN 2013. Kebijakan Pendataan. Data Pokok Pendidikan ( Dapodik ). Satuan Pendidikan. PTK. Peserta Didik. Substansi Pembelajaran. Program. Rombel / Angkatan. Proses Pembelajaran.

1 / 13

Download Presentation

DATA POKOK PENDIDIKAN DASAR 2013

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DATA POKOK PENDIDIKAN DASAR 2013 DIREKTORAT JENDERAL PENDIDIKAN DASAR KEMENTERIAN PENDIDIKAN DAN KEBUDAYAAN 2013

  2. KebijakanPendataan

  3. Data PokokPendidikan (Dapodik) SatuanPendidikan PTK PesertaDidik Substansi Pembelajaran Program Rombel / Angkatan ProsesPembelajaran Primer Sekunder, longitudinal

  4. Data Pokok Data Referensi Data Transaksi PolaUmum Data pokokmengacupada data referensi Data transaksimengacupada data pokok

  5. Roadmap Kualitas Data 2014 , Dst... Nilai Reliable 2013 Usable • Aksi: • Validasidanverifikasikontinyu 2012 Available • Aksi: • Integrasi • Pemutakhirankontinyu • Aksi: • Pendataan StrukturTerbentuk Upaya

  6. SkemaPemanfaatan Informasi strategis Data Center PDSP Analytical Tool Repository Unit Utama Sinkronisasi (incremental) Prov, Kab./Kota Data Individual WH ODS Informasi Publik, ProfilSekolah Referensi data pokok (bacalangsung) SistemTransaksional Rujukan “Cepat”

  7. INDIVIDUAL RELATIONAL OUTPUT • INTEGRASI 3 ENTITAS DATA PROSES BISNIS PENJARINGAN DAPODIKDAS DATA INDIVIDUAL SEKOLAH, PTK dan PESERTA DIDIK D(incremental) INPUT Data awal (Prefilled) PROSES BISNIS UTAMA • NPSN, NISN • NUPTK , • DATA BOS, DLL • DATA REFERENSI • DYNAMIC & LONGITUDINAL • SISTEM • TRANSACTIONAL O U T C O M E

  8. SOP PENDATAAN 2012

  9. Progress Report Progress Report DAPODIKDAS Infopendataan.dikdas.kemdikbud.go.id

  10. Upaya Penjaringan Data (Sekretariat Bersama Dapodik)

  11. Pembagian Tugas dan Wewenang Arus Informasi Support Arus Data

  12. Pemanfaatan Data 2012

  13. Satu NusaSatuBangsaSatuBahasaSatu Data Terimakasih

More Related
SlideServe
Audio
Live Player
Audio Wave
Play slide audio to activate visualizer