This project outlines the phased expansion of a VS store at The Falls in Miami. Phase 1 (5000 sq.ft.), Phase 2 (6052 sq.ft.), and Phase 3 (6240 sq.ft.) include temporary fitting rooms. Sales areas and layouts for each phase are detailed. Dates for start, completion, merchandise placement, barricade removal, and store opening are provided. The plan ensures efficient construction and minimal disruption to store operations during the expansion process.
E N D
VS# 034 The Falls in Miami Phasing plan /schedule
The Falls Phasing plan PHASE 1 Phase 1 5000 sq. ft. Phase 2 6052 sq. ft. Phase 3 6240 sq. ft. Temp fitting RM Phase 1 Phase 1 sales 5000 sq.ft.
Phase 1 on existing store layout Phase 1 Temp fitting Rm Sales 5000 sq. ft.
The Falls Phase 2 Temp fitting Rm Phase 2 Phase 2 sales 6052 sq.ft. Phase 1 5000 sq. ft. Phase 2 6052 sq. ft. Phase 3 6240 sq. ft.
The falls Phase 3 Temp Fitting RM Phase 3 Phase 3 sales 6240 sq. ft Phase 1 5000 sq. ft. Phase 2 6052 sq. ft. Phase 3 6240 sq. ft
VS# 034 The Falls in Miami • Phase 1 Start date : 2/20/2012 • Complete : 4/12/2012 • Merch : 4/15/2012 (Phase barricade down relocate 4/15/2012) • Open : 4/16/2012 • Phase 2 Start date: 4/16/2012 • Complete: 6/01/2012 • Merch : 6/03/2012 (Phase Barricade down relocate 6/03/2012) • Open : 6/04/2012 • Phase 3 Start Date: 6/04/2012 • Complete : 7/13/2012 • Merch : 7/16/2012 (Barricade removed 7/5/2012 ) • Open : 7/19/2012