An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. St Tammany Parish TMDL Response Plan – Progress in 2014 “Green & Grey Infrastructure for a Cleaner, Greener STP” Elizabeth deEtte Smythe, Ph.D. LA Urban Stormwater Coalition October 1, 2014

  2. The DRIVER: Water Quality Impairments EPA 303(d) List of Impaired Waterbodies (2006-2010) Dissolved Oxygen Impairments in all watersheds from: • Individual Sewer Systems • Construction & Development • Illicit Discharges

  3. The TMDL ProcessTotal Maximum Daily Load The GOAL: Water Quality Improvement • Calibration Model - Current Conditions • TMDL Model – Projection to “worst case” conditions TMDL = Allowable quantity of pollutant to meet standard …“pollutant budget” TMDL = LA + WLA + MOS

  4. TMDL Implementation • LDEQ has established more stringent discharge limits • Phase I TMDL Implementation allocates changes to hundreds of permitted & unpermitted facilities • STP has begun implementation of WW & SW projects in response to TMDLs • CPRA has re-modeled TMDLs to determine potential DO improvements from the projects • St Tammany Parish must enforce through MS4 Permit (Stormwater Ordinance required) • Require BMPs for NPS • Plan for Regionalization/upgrades • Encourage more WW Assimilation projects

  5. The VEHICLE for WQ Improvement: STP MS4 Permit LDEQ Multiple Separate Storm Sewer permit (MS4)

  6. 37 TMDLs Prepared by EPA & LDEQ for • STP Impaired Waterbodies • TMDL = Allowable quantity of pollutant to meet WQ standard…“pollutant budget”

  7. The “DO TMDL Effect” on STP Dischargers Drastic reduction of discharge limits for LPDES permittees • Distinct areas where loadings must be reduced • “No Parish Action” will severely impact permittees in the next permitting cycle

  8. What we found out about STP aka “the DO TMDL Effect” • 530+ LPDES dischargers impacted in STP • Five significant areas of impact “Clusters” • 35 “hot spots” indicating “failed standards”

  9. Point & Nonpoint Source LOADS Create DO “Hot Spots” R#2 • “Hot spots” – (Red Circles) • Failed sites usually located near • Multiple Point Sources • Unsewered S/Ds • Failed sites characterized by • HIGH Nonpoint Source loads • in TMDL models R#4-6 R#10

  10. The DO TMDL Effect: STP Response • Establish “cluster” areas where Parish will link SW and WW projects for max benefit • Evaluate/develop strategy for reducing loadings at “hot spots” • Retrofit drainage projects by adding WQ improvement components • Review Parish laws and modify (if necessary) to meet WQ goals • Implement education/outreach program for permit holders and the public

  11. Four-Pronged Approach to Water Quality Improvement 1. Wastewater 2. Stormwater 3. Conservation & Mitigation 4. Education & Outreach An Integrated, “green” concept

  12. 1. WW Consolidation Program ($54.4 Million spent to date)

  13. 2. SW Management Program ($67.6 Million spent to date) Drainage projects present opportunities for WQ improvement

  14. 3. Coastal, Conservation & Mitigation Program ($38.6 million spent to date) Greenprint Conservation Priorities

  15. 4. Education & Outreach Program STP is active in WQ improvement Education & Outreach Programs • TMDL Outreach Meetings • BMP Workshops • WQ Task Force Meetings • LA Urban SW Coalition (LUSC) • Staff SW Certifications & Training • Clean Marina Workshops • Re-Tree St Tammany • World WQ Monitoring Day • Household HW Day

  16. TMDL Action Plan: SW Progress (2014) • SW Demonstration Ponds (various BMPs) • SW Retention Ponds (Planted w/wetland vegetation) • LPBF has completed Year 1 “Hot Spot” monitoring • WW improvements completed • CPRA has re-modeled TMDLs to determine potential DO improvements from projects

  17. Stormwater Demonstration & WQ Ponds

  18. “Hot Spots” Identified by TMDLs at Locations Failing DO Standards 34 “Hot spots” • Allows STP to analyze CAUSE of standards failure • Most HS are in streams determined to be: • Flow-limited (stagnant) • Intermittant • Wetland-dominated

  19. Casa Bella SD(Aeration BMP) • 25 homes • 2 schools (1250 students & staff) • Sewered SD

  20. Del Sol SDFloating Wetland BMP ($250,000) Bioremediation: Floating wetlands mimic natural functions, transforming nutrients & pollutants into forms that are useful for organisms • >250 homes in micro watershed • 150 Sewered • 100 Unsewered

  21. LaBarre Street Vegetative Planting BMP ($3.5 million) • 205 homes benefitting • Sewer connections under construction

  22. Little Creek Commercial Pond (Induced Flow BMP: HS-03) • drainage benefit • commercial & residential runoff • Benefit to 5 “hot spots”

  23. CPRA Model: WW Consolidation Program in Bayou Vincent Alton Eagle Lake MHP • Eagle Lake MHP removes 10,600 GPD (RKm 20.4) • Alton SD removes 34,100 GPD (RKm 16.5) • Estimated to Improve DO from ~1 mg/L 4.6 mg/L

  24. CPRA Model: Ben Thomas Road Pond (Flow Augmentation) IF Pond Eagle Lake MHP Alton Proposed Pond will improve drainage AND WQ in the area

  25. 7.5-Acre Tammany Hills SW Pond( Vegetative Planting) Volunteers planted over 500 trees in November 2012

  26. Tammany Hills SD(Vegetative Planting) • 401 homes benefitting • Unsewered SD

  27. CPRA Model: 7.5-Acre Tammany Hills Sewer Improvements & SW Pond ( Vegetative Planting) Sewer improvements SW/WQ Pond • Sewerage improvements to Tammany Hills SD (RKm 8.3) removes 215,000 GPD • Adding the SW/WQ Pond provides additional DO benefits

  28. 14-Acre Chinchuba SW Pond (Vegetative Planting ) Volunteers planted over 4400 trees in February 2013

  29. CPRA Model: 14-Acre Chinchuba SW Pond (Vegetative Planting) Sewer improvements SW/WQ Pond • Even with sewer and pond improvements will be inadequate to meet the current DO standard • Area is minimally developed & wetland dominated (naturally dystrophic) • LDEQ and EPA are working to produce a UAA, lowering the DO Standard to a more appropriate level.

  30. 90-Acre Cypress Bayou SW Pond (Vegetative Planting/Flow Augmentation$5.3 million) Volunteers planted over 4,000 trees & herbaceous shrubs in December 2013 IF Pond • Even with Induced Flow, the WQ improvements will be inadequate. • The area is minimally developed & wetland dominated (naturally dystrophic) • LDEQ and EPA are working to justify a UAA lowering the DO Standard to a more appropriate level.

  31. Parish Financial Commitments to Drainage/WQ ($160.6 Million) A substantial achievement for any local government

  32. TMDL Response: Proposed Projects (Estimated Costs $37 Million)

  33. Demonstrated WQ Improvement: 2012 303(d) List