TE-EPC-LPC Section Meeting. JMC Meeting N°04 2009-03-24. Shutdown 2008-2009 and Restart 1. Linac II – PSB - restart done (some auxiliary PSU out of order as usual)  all converters in REMOTE - Enertron converters presented to David and Jeff PS

wan
Download Presentation

TE-EPC-LPC Section Meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TE-EPC-LPC Section Meeting JMC Meeting N°04 2009-03-24 JMC

  2. Shutdown 2008-2009 and Restart • 1. Linac II – PSB • - restart done (some auxiliary PSU out of order as usual)  all converters in REMOTE • - Enertron converters presented to David and Jeff • PS • - SMH16 and 26 (moved from 367 to 359)  installed, adjusted and tested OK • - SMH61 and 57 : see Vincent’s presentation • - more tests to be done for my personal understanding… • - testing of the spares (1 or 2 electronic cards) to be done (end of week) • - a spare electronic crate (GEREG crate+boards) is necessary, have to be ordered (who is in charge ?) and tested (when ???) JMC

  3. Shutdown 2008-2009 and Restart • Building 365 • - capacitor discharge converters to be adjusted and tested (end of this week) • CNGS Horn and Reflector • - thyristor racks installed and connected (except MCB status) • - some mechanical improvements to be finished (cabling and short-circuiters) • - tests to be done ( April 2009) JMC

  4. MegaDiscaP 2009 • Prototype Power Part • - mounting and cabling finished • - first tests to be done asap • Electronic crate • - schematic done • - backplane designed, received and mounted • - cabling of the crate to be done • Active Filter • - design 80% done (except dead times generation) • - mounting and cabling to be done (material has been ordered and received) • Maquette • - tests show we are on the good way (FPGA/DSP minor problem still to be solved) • Planning • - End of HELEN collaboration in April - Prototype validated (or not) in August • - paper for EPE in May ? JMC

  5. LHC 4-6-8 kA • Personal Study on going • - simplified global schematic (modifications of existing schematics ??) • - converter environment (FGC, interlocks) • - simulations (SIMPLORER) to be done • - tests and measurements (A7) • Documentation to be done • - see Vincent • and more... • LHC 13 kA • I’ve seen some converters of this type in the tunnel ! • 2. Difficult to start something before May-June 2009 JMC

  6. Minidiscap (Serge) • Technical specification started • Topology ? Control ? Interface ? • LHC Upgrade (Yves) • first simulations ASAP ( April 2009) JMC