10 likes | 122 Views
This document provides critical information regarding the transmission engineering setup for the ICG Hub located at Suite 844, 15th St., as well as its connections to the NCAR facility and UCAR’s locations. It includes technical specifications for fiber connections, contact details for key engineering staff, and testing dates for OTDR validation. The fiber distribution network encompasses various patches and routes connecting Boulder, CO, and other locations. This comprehensive overview supports ongoing operations and infrastructure planning.
E N D
23 01 71 71 23 02 72 72 24 24 Transmission Engineering NOTES: 1. 2. 3. ICG HUB Suite 844 910 15th St. SHEET ONE ICG HUB Suite 844 910 15th St. ICG Colo Level 3 1850 Pearl st. St. UCAR N. Classroom, Room 2208 1200 Larimer ST Total to NCAR Mesa: 262,337’ 59 05 Patch 219,513’ 23400’ Patch Patch 19225’ 7600’ Patch Denver, CO 80202 60 06 NE- RR 0000.00.00 800.01.07 102.09 ICG P.P. 800.05.03 800.03.03 800.02.08 C01.11.02 C01.11.01 83 0001.02.06 84 OTDR TESTED – 12/24/02 & 1/29/02 ICG BOULDER HUB 1665 Walnut St Patch NCAR Operations: 303-497-1200 Jim Van Dyke – Office: 303-497-1251 Cell: 720-641-7195 Chris Darren – 303-883-5921 Dick Hall(inst. Fman)C: 303-884-9399 72 66 UCAR lease 0001.07.06 13,630’ Two fibers to 910 15th St. x-connected to Boulder hub x-connected to Center Green BRAN.NCAR-Wht6 69 70 UC Boulder - Engineering Bldg 1111 Engineering Drive Patch 70 69 BRAN.NCAR-Wht5 UC Boulder - Engineering Bldg 1111 Engineering Drive ICG BOULDER HUB 1655 Walnut St 29,170’ UCAR ML-29/R1-P3-* UCAR 3070 Center Green UCAR CG2-2042/R4-P1-1 BRAN.NCAR-Wht6 0001.02.06 0001.07.06 70 69 Patch 71 71 71 71 65 02 52 NCAR/UCAR 1850 Tables Mesa Dr 13,630’ Patch 29,170’ Patch Patch Patch 16400’ Boulder, CO 80xxx Boulder, CO 80303 72 72 72 72 71 01 51 RR 0000.00.00 NE- RR 0000.00.00 NE- NE Pri OPC NE/TID Planning 10/01/02 WR. Outside Plant Sec OPC NE/TID Transm Engineer C-NET NE/TID Transp Construction REL Level Ops Planning Operations Mkt Planner Revisions Name Date