An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Oroville Facilities • FERC Project No. 2100 Ted Craddock, DWR 2014 NWHA Conference

  2. Serves 25 Million Californians and 750,000 Acres of Farmland • Includes: - 33 Storage Facilities - 20 Pumping Plants - 4 Pumping-generating Plants - 5 Hydropower Plants - 700 miles Canals &Pipelines • California’s fourth largest energy producer hydropower • Other benefits include: - flood control - recreation - Delta salinity control - environmental benefits - power grid stability State Water Project Overview

  3. Oroville Facilities • FERC Project No. 2100 • 762 MW Capacity • South SWP Hydropower FERC Project No. 2426 • 1,679 MW Capacity • DWR: 404 MW • LADWP: 1,275MW • Pine Flat Transmission Line FERC Project No. 2876 State Water Project FERC Licenses

  4. Oroville Facilities Power Developments Feather River

  5. Oroville Facilities FERC Licensing • Original FERC License Period • February 1, 1957 to January 31, 2007 • 2006 Relicensing Settlement Agreement • Proposed 50-year Term with License Conditions and Settlement Articles: • Environment • Cultural Resources • Recreation • Land Use and Management • Local Projects • DWR Preparing for FERC License Issuance • Performing Early Implementation Activities

  6. Oroville Facilities Habitat Improvement Plan

  7. Oroville Facilities LFRHIP Components • Spawning Gravels • Channel Improvements • Structural Habitat • Fish Weir • Riparian and Floodplain • Hatchery Improvements • Water Quality Monitoring • Oroville Wildlife Area • Instream Flow and Temps.

  8. Oroville Facilities LFRHIP Process Develop (Update) Plan 5-Year Assessments and Reporting Consult Ecological Committee Annual Reports FERC Review and Approval Monitor - Physical Elements - Biological Response Implement

  9. Oroville Facilities LFRHIP Integration COORDINATE Develop (Update) Plan COMPREHENSIVE 5-Year Assessments and Reporting Consult Ecological Committee INTEGRATE Annual Reports FERC Review and Approval Monitor - Physical Elements - Biological Response Implement

  10. Oroville Facilities Early Implementation • Spawning Gravels • Install 8,300 cy gravel in Feather River • Monitor salmonid/steelhead use • Assess substrate permeability in spawning areas • Evaluate effectiveness in improving spawning habitat • Results support proposed spawning gravel PM&E

  11. Oroville Facilities FERC Project No. 2100 Thank you