An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Cambrian Lessons Learnt Part 4

  2. Track side design (1) • Risk of loss of flexibility in operational moves during application design! • Learn how to read scheme plans in line with ERTMS and its workings • Need to consider: • Speed changes over short distances • Speed changes approaching an end of authority (EoA) • Release speeds approaching EoA when a lower speed applies beforehand • Location of balises when approaching speed changes

  3. Track side design (2) • Distance between block markers • Location of awakening areas • Line speed over points and crossings • Location of all permissive movements will require OS mode areas • Time taken to do simple moves extended

  4. Operational issues • Robustness of design during normal working (two cabs open as an example) • In many cases will be learning new train as well as ERTMS • Revised fault and failure modes based around maintaining ERTMS position report • Controlled ability to reset the European Vital Computer (EVC) • Use of SH mode in depots, sidings and on the main line • Mode transition when leaving depots and in service running

  5. GSM-R issues • Arrangements when GSM-R data/voice is turned off for upgrade • Time taken to load data from DMI to GSM-R radio • Five digit GSM-R train reporting number required on driver diagrams • Correct use of three digit location code and use of wild card numbers (99x) • Learning how to read GSM-R voice and data outputs

  6. Speed profile Line speed profile 25 50 90 Draw line speed as a negative 25 50 90

  7. Speed profile on DMI 25 50 90

  8. On the DMI

  9. Example scheme plan 9

  10. Example mode map

  11. Example Sectional Appendix

  12. Example Yellow Notice

  13. ERTMS in Netherlands Hanzelijn line • L2 ETCS overlay on Amsterdam to Utrecht (35km mainline). 4-track mainline used by 75% of NS fleet • Fitted to: • new Hanzelijn line • new high speed line • Rotterdam freight route • UK team wanted to learn lessons from Netherlands compared to GW overlay and links to Thameslink Amsterdam to Utrecht High Speed Line Freight Route

  14. Overlay and other issues • Driving style may change • Drivers to have key /swipe card to use ETCS • Drivers to use DMI as priority and if red signal reported if seen • If transition to L2 does not work then carry on using ATB and no requirement to inform the signaller • Written orders are not used in failure situations • NS have very small overlaps which helps with ETCS fitment • Uses a 4-track route so trains can be rerouted easily in a failure situation