1 / 31

Spacecraft Solar Arrays Shading Visualization

This project presents a graphical model for visualizing sunlight shading on solar panels of an orbiting spacecraft, particularly the International Space Station (ISS). The application computes the sun's position relative to the Earth and the ISS to illustrate shadow zones and areas receiving direct sunlight. Utilizing Unity as a 3D game engine, it numerically displays shaded areas of the solar arrays and calculates the power received from sunlight. The project highlights the intersection of orbital mechanics and interactive 3D visualization technology.

verdad
Download Presentation

Spacecraft Solar Arrays Shading Visualization

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Spacecraft Solar Arrays Shading Visualization Presented By: Capstone Team1 Date: 03/05/2010

  2. Team Information Team Members • Ajay ChandJasti • SumanBabuAlapati • Vamsi Krishna Guntupalli • Naveen Kumar Aluru • KarthikBhuvanagiri Instructor • Dr.Alfredo Perez Davila Mentor • Mr. Peter Armstrong

  3. Team Members & Roles • Ajay ChandJastiTeam Leader and Programmer • Vamsi Krishna GuntupalliProgrammer & Documentation • KarthikBhuvanagiri Research & Testing • SumanBabuAlapatiWeb developer & Programmer • VenkataNaveenAluruMaintenance & Testing

  4. Agenda • Introduction • Background • Objective • Project Overview • Requirements • Functional Requirements • Non-functional Requirements • Environment (tools and technologies) • Architecture • Project Schedule • Future Work • References

  5. Introduction • Background: • A spacecraft such as the International Space Station is in a simplified Earth orbit. As the spacecraft circles the Earth its orientation relative to the Sun continuously changes. • The structure of the spacecraft casts continuously varying shadows upon the solar arrays.

  6. Introduction(Cont..) • Objective: • Graphically model the shading of sunlight on the solar panels of an orbiting spacecraft. • Analytically determine the area of the solar panels exposed to sunlight and the resulting incident radiant energy.

  7. Project Overview • We shall create an application that visualizes the International Space Station in a simplified Earth orbit; The overall application is implemented in Unity. • The proposed application will determine the area of the solar arrays exposed to direct sunlight and the amount of power deposited by the sunlight onto the arrays. • Unity is a 3d game engine which would be used for the above project.

  8. Project Overview(Cont.) • Unity, will be used to render the visualization of the spacecraft. Unity is available on multiple platforms, including the iPhone/iPod Touch. Figure: Spacecraft Solar Arrays Shading Visualization

  9. Requirements The requirements are subdivided into: • Functional requirements • Non-functional requirements

  10. Requirements(Cont..) • Functional requirements The application shall do the following: • Computes the position of the sun with respect to the Earth and ISS. • Rotate the ISS such that solar arrays are perpendicular to the direction of the sun. • Numerically display the shaded area of each solar array, in square meters, and the percentage of the array that is in sunlight. • Display the current date and time in UTC.

  11. Requirements(Cont..) • The application shall allow the user to pause the time, reset the time to the element set epoch, reset the time to the current (real) clock time, and advance the time forward or backward in 1x, 10x, 100x, and 1000x multiples of real time. • The application shall allow the user to input the epoch (year, month, day, hour, minute, second in Universal Coordinated Time (UTC)) and the following Keplerian elements of the ISS: a) semi-major axis in meters b) eccentricity (unit less number between 0 and 1, inclusive) c) inclination in degrees d) right ascension of the ascending node in degrees e) mean anomaly in degrees f) argument of periapsis in degrees

  12. Requirements(Cont..) • Non - functional requirements • The application is developed in Unity game engine, where we will be importing the assets like ISS and 3D model of Earth and a point source of light which will act like sun.

  13. Environment (tools & technologies) • Tools • Using Rational Unified Process Initiated Construction phase • TECHNOLOGY AREAS: • Unity • 3D graphics • Orbital Mechanics

  14. Tools & Technologies (Cont..) • Unity pro 2.6.1 • Unity is a 3d game engine and an authoring tool for creating 3D video games or other interactive content such as architectural visualizations. • Unity has two important views namely game view and project view. • Game Objects can be imported into the project view and can be viewed through the game view.

  15. Project View

  16. Game View

  17. Sample Code Of On Mouse Move

  18. ISS Architecture Figure: International Space Station

  19. ISS • The ISS as of now is the largest satellite orbiting the earth. • The solar alpha rotary joint (SARJ) is the main rotary joint which allows the solar arrays to track the sun. • The following is a small video showing the external image of the ISS around the planet.

  20. Use case diagram

  21. Use case diagram(Cont..) • User controls camera Normal Flow: • User opens the project. • User shall enter the position coordinates for the camera or shall control that by using the GUI. • The view shall be updated to the specified coordinates.

  22. Use case diagram(Cont..) • User inputs epoch Normal Flow: • User opens the project. • User shall input the epoch (year, month, day, hour, minute, second in Universal Coordinated Time (UTC)) • User opens the application in the Unity web browser and then he shall be able to input the time and control the time and pause the time.

  23. Architecture Diagram

  24. Sequence Diagram

  25. Workflow Diagram

  26. Project Schedule

  27. Works Completed • Created SRS document. • Completed the design phase. • Imported the ISS and Earth into Unity.

  28. Future Work • Planning to start scripting in Unity. • Calculation of the sun position vector. • Numerically calculating the area of the solar arrays in sunlight. • Visualizing the application with the necessary requirements graphically in Unity.

  29. References • http://unity3d.com/unity/features/iphone-publishing • http://www.nasa.gov/mission_pages/station/main/index.html • http://3dbuzz.com/forum.html • http://unity3d.com/support/documentation/Manual/index.html

  30. THANK YOU

  31. QUIERIES??

More Related