1 / 1

Vertical Test System and T-mapping/X-ray-mapping at KEK-STF

Vertical Test System and T-mapping/X-ray-mapping at KEK-STF Y. Yamamoto , H. Hayano, E. Kako, S. Noguchi, H. Sakai, M. Satoh, T. Shishido, K. Umemori, K. Watanabe (KEK, Japan). Commissioning Test. [SRF2009@Berlin; TUPPO 038]. AES#001 cavity was used, which was on loan from FNAL.

veda-briggs
Download Presentation

Vertical Test System and T-mapping/X-ray-mapping at KEK-STF

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Vertical Test System and T-mapping/X-ray-mapping at KEK-STF Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, H. Sakai, M. Satoh, T. Shishido, K. Umemori, K. Watanabe (KEK, Japan) Commissioning Test [SRF2009@Berlin; TUPPO 038] AES#001 cavity was used, which was on loan from FNAL. Pinpoint attachment at suspicious spot Successful! Summary Abstract The new vertical test facility was completed at STF and it is routinely used without any trouble. The commissioning test for the system check was successful by using the AES#001 cavity. The T-mapping and X-ray-mapping system was completed and the heating location at the quenching was perfectly detected. There was a correlation between the heating location and the X-ray emission site, when the cavity has a heavy field emission. In the near future, a new DAQ system using EPICS will be introduced, which is under developing. Suspicious spots A new vertical test facility was built in KEK-STF (Superconducting rf Test Facility) and in operation since July/2008. After the commissioning tests using AES#001 cavity which was on loan from FNAL, vertical test was routinely started for S1-Global project at KEK-STF. At the same time, a new T-mapping system was introduced for the identification of the heating location at the thermal quenching, which has 352 carbon resistors and is capable of more certainly identifying that, compared to the original T-mapping system. Recently, a new X-ray-mapping system is also completed. Suspicious spots at #3 cell Vertical Test System at STF T-mapping/X-ray mapping System & Results MHI#5 MHI#9 1st power rise @π mode Equator of #2 cell 7π/9 π π 5π/9 8π/9 3π/9 6π/9 4π/9 Summary of T-mapping result at STF X-ray-mapping T-mapping 2nd power rise @π mode Equator of #9 cell

More Related