An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. New xTCA Developments at SLAC CERN xTCA for Physics Interest Group Sept 26, 2011 Ray Larsen SLAC National Accelerator Laboratory New xTCA Developments at SLAC - R. Larsen

  2. Topics Standards developments Applications Demonstration Program Future Plans New xTCA Developments at SLAC - R. Larsen

  3. Standards • Hardware, Software working groups meet weekly/ needed • 2 new HW standards approved • ATCA • PICMG3.8 Standard IO interface to Rear Transition Module (RTM), IPMI extension & power connector • MTCA • MTCA.4 Crate, 2-wide AMC & RTM, IO interface, IPMI extension and power pins designated New xTCA Developments at SLAC - R. Larsen

  4. Standard Extensions for Physics New xTCA Developments at SLAC - R. Larsen

  5. Standards Details • ATCA PICMG3.8 • 120 5GHz BW IO channels on 3- 4x10 ZD connectors • New connector (Positronix) for IPM, power • Mechanical, E-keying functions • Implemented on SLAC MPP Processor (M. Huffer) • MTCA.4 • Extends double-wide shelf (crate) to include RTM • 60 ChIO, IPMI on 2- 3x10 ZD connectors • Extended backplane timing, trigger, interlocks layer • Compatible with all existing 1-wide AMC products • Implemented by Schroff, ELMA, PT, others in dev’mt New xTCA Developments at SLAC - R. Larsen

  6. PICMG3.8 RTM Interface Standard Rear View 120 - IO Channels (3x40) IPMI, Power Connector (blue) 2 Mechanical Keys Courtesy M. Huffer, SLAC New xTCA Developments at SLAC - R. Larsen

  7. MTCA.4 AMC-RTM-Shelf Concept New xTCA Developments at SLAC - R. Larsen

  8. MTCA.4 12-AMC Backplane Intlk, Vector Sums Parallel Triggers New xTCA Developments at SLAC - R. Larsen

  9. MTCA.4 Backplane Timing Distribution 2 radial clocks per AMC,low jitter MCH Cross- Point-Switch Backplane Central Timing AMC Timing AMC ADC AMC ADC Enc.Clock Enc.Clock Trigger Trigger Interlock Interlock 8 bussed lines,M-LVDS for Clocks, triggers, interlocks Courtesy K. Rehlich, DESY New xTCA Developments at SLAC - R. Larsen

  10. µRTM Extended IPMI Circuit New xTCA Developments at SLAC - R. Larsen

  11. MTCA.4 Prototype Shelves & Modules Emerging New Electronics Standards - R. Larsen

  12. MTCA.4 - 12 Slot Shelf Dual Star Back-Plane Dual PU slot Dual MCH Slot 12 Payload AMC-RTMs Dual Star Redundant Front View New xTCA Developments at SLAC - R. Larsen

  13. MTCA.4 - 6-Slot Shelf Non-Redundant 6 Slot Development Shelf 1-Star Non- Redundant Front View 6-Slot Rear View Courtesy Schroff, Struck New xTCA Developments at SLAC - R. Larsen

  14. SLAC Applications Demonstrations LLRF for Main Linac S-Band 50MW station Klystron interlocks for 10MW L-Band station Beam Position Monitors for LCLSII Injector New xTCA Developments at SLAC - R. Larsen

  15. 1. S-Band LLRF • Demonstrate intra-pulse feedback to achieve ~30fs phase control • Lower noise RF front end chassis • New solid state sub-booster • Feedback loop implemented in MTCA.4 using Struck 10 Ch ADC 2 Ch DAC developed w/DESY • New LCLSI waveguide water-stabilized rack • Test on Standby triggering, switch to Accelerate • Tests on accelerator to complete Oct 2011 New xTCA Developments at SLAC - R. Larsen

  16. LLRF MTCA & RF Chassis Testing New xTCA Developments at SLAC - R. Larsen

  17. Rear View New xTCA Developments at SLAC - R. Larsen

  18. RTM Inputs Note – Preliminary RTM shown Final RTM with full IPMI complete, In test. New xTCA Developments at SLAC - R. Larsen

  19. RF Chassis – Reference, LO, Sources, Downmixers Note – Next stage plan is to test L-Band down-mixers, other RF modules in MTCA card format New xTCA Developments at SLAC - R. Larsen

  20. AMC - 10/2Ch ADC/DAC 16bit 125 MSPS Initial Applications: LLRF DESY XFEL LLRF SLAC Upgrade Proto Photo courtesy M. Kirsch, (Struck ) Emerging New Electronics Standards - R. Larsen

  21. RTM 10 Ch ADC-DAC, IPMI Interface • Rear Panel • Mini-Coax IF Signals In • RF Ref In • Trigger in • Dual I&Q DAC Out • IPMI Extension to RF Chassis Courtesy A. Young, SLAC Emerging New Electronics Standards - R. Larsen

  22. 2. MTCA Klystron Interlocks S&L Band • FPGA based interlocks in MTCA.4 • S-Band interlocks currently in separate FPGA non-modular chassis • L-Band interlocks currently FPGA based in VME • MTCA solution will serve both in future • SLAC designed RTM mates to new TEWS Spartan 6 FPGA module (just received in US) • RTM testing starting • 1 board pair serves 8 Ch-60MSps, 16 Ch-2KSps • 2 board pairs serve 1 S- or L-band station New xTCA Developments at SLAC - R. Larsen

  23. RTM FPGA Interlocks • Rear Panel • Inputs • - 8-60 MSps Ch • - 16-2 KSps Ch • - 12 bits Diff +/- 1V • - Diode protection • All channels • Outputs • - Interlock Sums • RF Interlocks for • L-Band 1 msec, S-band 1.5 µsec Courtesy D.G. Brown, SLAC Emerging New Electronics Standards - R. Larsen

  24. AMC TAMC651 FPGA w/RTM Courtesy TEWS Note – Completion date for ESB installation Dec. 2011. New xTCA Developments at SLAC - R. Larsen

  25. 3. BPMs for LCSLII Injector • Goal: Demonstration of 8 BPMs in 12-slot • RTM has 4 Ch analog plus calibration w/ strip-line coupling between 120 Hz pulses • AMCs will be 4 Ch 125 or 250 MSps (125 available now; 250 may be developed by commercial supplier(s) • 250 MSps needed if multibunch (2 bunches 8 nsec apart) • Requirements being finalized (16 bit ADCs) • Preliminary RTM layout indicates feasible New xTCA Developments at SLAC - R. Larsen

  26. BPM System Block Diagram Courtesy S. Hoobler et al, private communication New xTCA Developments at SLAC - R. Larsen

  27. Conclusions 1 • Standards for hardware have passed 2 major milestones • Committees will disband when SOWs complete • Software committee continues developing guidelines for architecture and protocols • Member labs remain involved in PICMG through Coordinating Committee for oversight, servicing tweaks • Start new initiatives, SOWs, form committees as needed New xTCA Developments at SLAC - R. Larsen

  28. Conclusions 2 • SLAC new initiatives open future opportunities • Main Linac RF upgrades for LCLSII, I. • BPM upgrades for LCLSII Injector, Main Linac • Interlock systems wholly contained in MTCA.4 combined RF-Controls package • Long range: Complete replacement CAMAC controls in 2-mile accelerator, $20M program • Timeline: • RF and interlock demos complete in Q1-2 FY12 • BPM AIP completes Q2 FY13 New xTCA Developments at SLAC - R. Larsen