DESCRIPTION

销售报告系统. Beth. 4. 3. 1. 5. 2. 6. 系统分析. 问题定界. 系统设计. 实施. 系统开发. 测试. Tyler. Hannah. Jim. Beth. Beth. Maggie. 1.1. 1.2. 3.4. 3.1. 3.3. 3.2. 1.3. 收集数据. 可行性 研究. 准备报告. 数据输入 和输出. 评估. 准备报告. 处理数据与 建数据库. Beth. Jack. Joe. Rose. Tyler. Sharon. Cathy. 6.1. 2.1. 3.1.1.

1 / 7

Download Presentation

范围管理技术 -WBS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 销售报告系统 Beth 4 3 1 5 2 6 系统分析 问题定界 系统设计 实施 系统开发 测试 Tyler Hannah Jim Beth Beth Maggie 1.1 1.2 3.4 3.1 3.3 3.2 1.3 收集数据 可行性 研究 准备报告 数据输入 和输出 评估 准备报告 处理数据与 建数据库 Beth Jack Joe Rose Tyler Sharon Cathy 6.1 2.1 3.1.1 4.1 5.1 6.2 5.2 3.1.2 4.2 2.2 6.3 4.3 5.3 3.1.3 2.3 4.1.2 3.1.4 5.4 2.4 4.1.1 4.4 软件 会晤用户 软件 菜单 培训 硬件 研究现有 系统 硬件 系统转换 数据输入 屏幕 定期报告 明确用户 需求 网络 准备报告 网络 准备报告 准备报告 准备报告 特殊问题 定制软件 包装软件 Jim Jim Tyler Maggie Hannah Beth Steve Tyler Gene Joe Greg Steve Jack Jeff Gerri Hannah Jim Maggie Jack Rose Jeff 范围管理技术-WBS 1 级 2 级 3 级

  2. WBS

  3. WBS-OBS 责任矩阵

  4. WBS – CBS 帐户(科目)矩阵

  5. WBS – RWBS 风险矩阵

  6. WBS - CWBS合同矩阵

  7. EPS 总负责人 OBS EPS 结点 EPS 结点 EPS 结点 项目A 项目B 项目C 角色 WBS 经理 程序 员 质量 员 WBS1 WBS2 WBS2 资源 张 王 李 活动1 活动2 活动3 活动4 日历 科目