An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ADU PLANNING AND PERMITTING • www.unitedadus.com

  2. SITE ASSESSMENT & FEASIBILITY • Evaluate zoning, parcel size, setbacks, and utility access • Identify permitted ADU types (detached, attached, garage conversion, JADU)

  3. DESIGN & DOCUMENTATION • Develop architectural drawings, floor plans, structural, energy compliance, and site maps • Consider leveraging pre-approved ADU plans to fast-track approvals

  4. Streamline ADU planning and permitting effortlessly with United ADUs—from feasibility to zoning, design, and permit approval, we guide every step. Discover our expert, hassle-free process at www.unitedadus.com.

  5. SUBMISSION, REVIEW & APPROVAL • Submit plans to your local building department for initial completeness check, followed by multi-agency review • Address clearances from planning, utilities, sanitation, and historic or preservation departments as needed • Upon clearance and fee payment, the plans become “Ready to Issue”, and the building permit is released

  6. CHALLENGES & UNITED ADUS ADVANTAGE • Challenges: • Permit timelines can stretch 4–9 months, depending on scope and jurisdiction • Utility delays—for instance, power upgrades—can further impact timelines in areas like California • United ADUs Advantage: • End-to-end management: feasibility, design, documentation, permit navigation, utility coordination, and support through issuance. • Smooths complexities and reduces wait times, providing a seamless path to construction.