Liquid floor screeds such as the liquid anhydrite screed that we install at UK Screeds do need the preparation work carried out to the very highest of standards, but it is not difficult, and in any case, we carry out all the preparation work for you.

Download Presentation

How To Prepare A Floor For Installation Of Liquid Screed

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. How To Prepare A Floor For Installation Of Liquid Screed Liquid floor screeds such as the liquid anhydrite screed that we install at UK Screeds do need the preparation work carried out to the very highest of standards, but it is not difficult, and in any case, we carry out all the preparation work for you. To begin with, the building itself should be weather tight with the roofing fitted and also the doors and windows. If the doors and windows have not been fitted, then all the openings need to be fitted with clear polythene. It is also best if the walls have been plastered and have dried out before commencing operations. Dust and debris need to be removed from the floor surface. Before laying the liquid screed – also known as a self-levelling compound in Hampshire – it is necessary to lay insulation boards on the flooring. This helps to ensure that all the heat goes up into the room where it is needed. Sometimes there may be pipework running across the floor and if this is the case, the insulation boards need to have grooves cut into the underside in order to accommodate them. The insulation boards need to be laid flat and not be unstable when walked on, and they need to be butt jointed with staggered joints. After this, the next job is to stick a fine foam insulation strip on the walls or any other vertical surface such as a door frame that will come into contact with the screed. What this will do is allow for any minor expansion that may occur as the screed dries. The next thing to do is to lay a membrane over the insulation so that the liquid screed cannot escape and cause issues with the insulation boards, including in a worst-case scenario causing them to float upwards. The membrane is typically

  2. 500-gauge polythene and needs to be stretched out tightly and lapped up the walls at a tight right angle and glued into place with a spray adhesive. Any exposed edges such as door openings need to be provided with temporary formwork. If underfloor heating is being installed, the next job is to lay the heating pipe and screw or staple it down. The membrane will not leak because the screws or staples will seal the holes themselves. What is important is to ensure that the screws or staples are no further apart than 300mm because otherwise, the heating pipes could start to float upwards when the liquid levelling compound is installed. For the same reason, the heating pipe should be filled with warm water. They should also be pressurised in order to check for any leaks. READ MORE UK Screeds Ltd 5 Thorpes Field Alvescot England Bampton Oxfordshire OX18 2QF 0800 197 8802 info@ukscreedsltd.co.uk https://www.ukscreedsltd.co.uk/