1 / 12

AMI Program Phase I Technology Assessment

AMI Technology Vendor Briefing February 3, 2006. AMI Program Phase I Technology Assessment. AMI Phase I. AMI Program will use a multi-phased approach to development and deployment of a next generation advanced metering infrastructure over a 7 ½ year timeframe. Phase I. Phase I. Phase I.

tyanne
Download Presentation

AMI Program Phase I Technology Assessment

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AMI Technology Vendor BriefingFebruary 3, 2006 AMI ProgramPhase I Technology Assessment

  2. AMI Phase I AMI Program will use a multi-phased approach to development and deployment of a next generation advanced metering infrastructure over a 7 ½ year timeframe. Phase I Phase I Phase I Phase I Phase II Phase II Phase II Phase II Phase III A Phase III A Phase III A Phase III A Phase III B Phase III B Phase III B Phase III B 18 Mos. 18 Mos. 18 Mos. 18 Mos. 18 Mos. 18 Mos. 18 Mos. 18 Mos. 12 Mos. 12 Mos. 12 Mos. 12 Mos. 42 mos. 42 mos. 42 mos. 42 mos. 12/2005 6/2007 12/2008 12/2009 5/2013 Business Business Business Beta Beta AIM Requirements, Beta Product AIM Requirements, Beta Product Design & Design & Case in Chief Development Development “Design” & Proof of Concept Proof of Concept Field Pilot Field Pilot “ Design ” & Proof of Concept & Pilot & Pilot Application Proof of Concept Full Deployment Meter Trade & Meter Trade & Meter Trade & Meter Trade & Business Process Business Process Business Process Business Process Feasibility Studies Pre Deployment Feasibility Studies Feasibility Studies Feasibility Studies Design & System Dev Cost/Benefit Analyses Activities Conceptual Processes Conceptual Processes Final Business Case Cost/Benefit Analyses & Systems & Systems Reqs Reqs www.sce.com/ami

  3. SCE Proposal SCE Proposal AMI AMI Price Price Price Price Response Response Response Response A/C Load A/C Load A/C Load A/C Load Control Control Control Control O&M O&M O&M O&M Operations Operations Operations Operations Cust Cust Svc Svc Cust Cust Svc Svc Capital Capital Capital Capital (Meters, (Meters, (Meters, (Meters, Meter Meter Meter Meter Network, Network, Network, Network, Reading Reading Reading Reading IT) IT) IT) IT) Costs Benefits Costs Benefits Benefits SCE Aug., 2005 Supplemental SCE Aug., 2005 Supplemental Testimony supporting Phase I Testimony supporting Phase I SCE AMI Business Case – Directional Cost/Benefit Address fundamental cost drivers for last business case • Telecom network coverage, performance, reliability and system management • Meter failures and life-cycle performance • Interoperability & system security • End-to-end data management Re-evaluate Aug 1st added functionality • Interface to A/C load control thru PCT • Remote service turn on/off Identify additional uses for system based on tangible customer and business value Develop new conceptual estimate of overall business case www.sce.com/ami

  4. Phase I Program Scope External Engagement System Design Technology Development Business & Functional Requirements Regulatory Stakeholder Engagement Technology Advisory Board Industry Standards Utility Collaboration Vendor Engagement Technology Evaluation Vendor Product Bench Testing Reference Architecture Trade-off Analysis Cost/Benefit Analysis Preliminary Business Case & Regulatory Application www.sce.com/ami

  5. Oct-05 Jan-06 Apr-06 Jul-06 Oct-06 Jan-07 Apr-07 System Requirements, Architecture & Design Define AMI Requirements AIM Conceptual Architecture Reference Design Cost/Benefit Analysis Preliminary Dynamic C/B Model Development Preliminary Cost/Benefit Analysis Feasibility and Trade-Off Analysis Final Business Case Vendor & Technology Assessment Vendor Communication & Collaboration Component/Feasibility Technology Trials RFI Part I - Conceptual Feature Set Monitor Vendor's Alpha Product Development Business Requirements Beta Product Testing at SCE AMI System RFP Utility & Industry Engagement Utility Outreach Technology Advisory Board External Communications Tentative Phase II Regulatory Preparation Application for Phase II Motion to schedule Phase II Hearings Pre-Hearing Conference Possible Settlement Discussions AMI Phase I Summary Schedule www.sce.com/ami

  6. Development Challenges Collaborate with vendors to achieve the right balance among Marketability, Functionality and Openness Marketability Leverage OpenAMI, Intelligrid, Gridwise, CEC PCT, ANSI & other standards and reference design initiatives Engage other utilities & vendors in development process to generate interest and feedback Openness Functionality Durable open design that will support a solid positive business case that provides customer value www.sce.com/ami

  7. Building Block Approach In-Home Display Devices Lighting Controls Metrology Communications Electronic Ballast Wall Switches Area lighting Etc… Usage / Cost Profiling Messaging Etc… Load Switches Local Area Network Wide Area Network Interface Home Area Network Interface (HAN) A/C Compressor Pool pump Outlet device Intelligent Circuit Breakers Etc… • PQ Metrics • Integrated Disconnect • Integrated Intelligence • Enhanced Memory • >15 Year MTTF • Full Two-way • Upgradeability • Multiple integrated WAN options • Minimal network Administration • Self registry capabilities • Reliability • 3 X 3 • Security Smart T-stat Display Confirmation Data capabilities Etc… www.sce.com/ami

  8. SCE AMI Technology Assessment Approach Level 1 (Alignment) Level 2 (Validation) ID “Next Gen” development Level 3 (Lab Testing) Due Diligence Reviews Q4-’05 Level 4 (Field Test) Q2-’06 Product Availability & Testing Level 5 (Full Deployment) Q4-’06 L1 Key Criteria: - Functional Capabilities - Product Timing - Commercial availability - 3 X 3 Interoperability - 2-way - Reliability & Availability - Security - Serviceability - HAN Capabilities - WAN Options - Target price range - MTTF - Other Phase II Phase III L2 Key Criteria: - Design Development - Production Capabilities - Financial Condition - Processes: Business / Development Manufacturing (NPI) - Supply Chain - Small Requirements Gaps - Other L3 Key Criteria: - Successful Lab Test - Added functionality - Flexibility - Commercial Terms - Other www.sce.com/ami

  9. SCE AMI System Architecture Principles Specific technologies will be evaluated based on their ability to enable these overall AMI system behaviors and design principles. • Availabilityis the percentage of the scheduled uptime during which a system is actually available to users. Availability affects service at many levels. • Reliabilityis the probability that a component will perform its required functions for the duration of a specified time. • Interoperability (a.k.a.) Opennessis the degree to which the system’s configuration permits transparent access and integration among multi-vendor equipment and applications. • Serviceability - The ease with which corrective maintenance or preventative maintenance can be performed on a system. Higher serviceability improves availability and reduces service cost. Serviceability is a broad definition which includes the following system behaviors and design principles. • Manageability is the degree to which available system administration and application management resources can maintain and operate the system. It is the degree to which the configuration minimizes maintenance requirements and supports problem evaluation and easily replaceable components. • Maintainability is the probability that a failed component is returned or restored to a specified condition when maintenance is performed by personnel with specific skill levels, using prescribed procedures and resources • Extensibility is a system design principle where the implementation takes into consideration future growth. It is a systemic measure of the ability to extend a system and the level of effort required to implement the extension. Extensions can be through the addition of new functionality or through modification of existing functionality. The central theme is to provide for change while minimizing impact to existing system functions. • Securabilityis similar to manageability in the way it affects the solution. Securability includes: Authentication; Authorization; Confidentiality; Data Integrity; Non-repudiation; and Availability. www.sce.com/ami

  10. SCE AMI System Architecture Principle - Example Create a requirement for interoperability that is supported by multiple meter and communications vendors and is commercially viable in the NA utility market (“3x3”) 3x3 Example: A meter manufacturer’s residential product can successfully integrate with three different communication solutions AMI Solution A AMI Solution B AMI Solution C Interoperability (a.k.a.) Openness is the degree to which the system’s configuration permits transparent access and integration among multi-vendor equipment and applications. www.sce.com/ami

  11. Next Steps • RFI response clarification interviews: Feb. 13 – Mar.10 • Kema will be contacting each firm to set-up phone interviews • Please be prepared to clarify responses given to RFI • Interviews will be limited in scope to answers already provided and therefore, we expect that NDAs will not be required at this stage • If you have or will soon have product available for testing please be prepared to discuss timing and the opportunity for us to witness testing at your facility prior to our acceptance for our lab testing. • Release of SCE’s AMI Requirements: by early April • Business and functional requirements will be emailed directly to each firm • Requirements will also be posted on our website • Please ensure that we have your current contact info – we have updated our database based on your RFI responses www.sce.com/ami

  12. Q&A For more information and updates on the AMI program including key work products, procurements, business cases and filings. visit our website @ www.sce.com/ami Any inquires about the December RFI should be forwarded to Paul Kasick, Manager AMI Technology Assessment, AMITechnology@sce.com. www.sce.com/ami

More Related