1 / 20

bmci.by

THE ECOLOGICAL MONITORING CENTER. Investment Project. Atlas. www.bmci.by. JSC “Belgorkhimprom” Activity. EMC Work Direction. Partners in the Republic of Belarus. PRL of Project “PA “Belaruskali”. GAS SUPPLY OF THE 2 nd ORE DEPARTMENT OF RUE « PA « Belaruskali ». Project proponent :.

trynt
Download Presentation

bmci.by

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. THE ECOLOGICAL MONITORING CENTER Investment Project Atlas www.bmci.by

  2. JSC “Belgorkhimprom” Activity

  3. EMC Work Direction

  4. Partners in the Republic of Belarus

  5. PRL of Project“PA “Belaruskali” GAS SUPPLYOF THE 2ndOREDEPARTMENT OF RUE «PA «Belaruskali» Project proponent: Greenhouse gases emission reduction – 20 353 t СО2/year Greenhouse gases emission reduction in a period from 2009 to 2012 – 81 412 t СО2 Project realization costs - 7 088,2 thousand € Carbon finance share – from8,6% to 11,5%from the project cost

  6. PRL of Project“PA “Belaruskali” GASSUPPLYOF THE 3nd ORE DEPARTMENT OF RUE«PA“BELARUSKALI” Project proponent: Greenhouse gases emission reduction – 19 879 t СО2/year Greenhouse gases emission reduction in a period from 2009 to 2012 – 60 000 t СО2 Project realization costs - 9 339 thousand € Carbon finance share – From 4,8% to 6,4%from project cost

  7. PRL of Project“PA “Belaruskalii” CO-GENERATIONAL ENERGYGENERATING INSTALLATION CONSTRUCTION WITH RECOVERY BOILERS ON THE TERMAL POWER PLANTOF THE 1st ORE DEPARTMENT • Project proponent: • Own electricity production increase in more than2times. • Actual annual fuel economy on replacement of electrical power system - 19 923 000 n.m3gas. • Reduce of contaminant emissions to the atmosphere in quantity of • 79,841 t/year. Greenhouse gases emission reduction in 2012– 38 219 t СО2/year Project realization costs - 12 120thousand € Carbon finance share – from2,4% to 3,2%from the project cost

  8. JSC “Grodno Khimvolokno” project IMPLEMENTATION OF 4,5-6 MW DEFINED CAPACITY WIND-DRIVEN POWER PLANT In the result of wind-driven power plant implementation producing of electric energy without СО2is assumed Greenhouse gases emission reduction– 2 940 t СО2/year Project realization costs - 6 750-9 000 thousand € Greenhouse gases emission reduction in a period from 2009 to 2012 – 5 880 t СО2 Annual income from generated ERU sale– from 22 050 € to 29 400 €

  9. JSC “Grodno Khimvolokno” project ENERGY COMPLEX RECONSTRUCTIONUSING POWER EFFICIENT TECHNOLOGY Greenhouse gases emission reduction– 57 384t СО2/year Greenhouse gases emission reduction in a period from 2009 to 2012 – 229 536 t СО2 Project realization costs - 15 000-16 000 thousand € Carbon finance share (a year) – from2,7%to3,6%from the project cost

  10. Facility “Polimir” JSC “Naftan” project CONSTRUCTION 0F9 MW ENERGOTECHNOLOGICAL COGENERATION UNIT WORKING ON THERMALWASTE ENERGY Gas-pumping unit (GPU) utilization involves usage of 757 m3/h of natural gas. Fuel gas (mixture of МВФ 93.7% and natural gas – 6,3%) usage will remain at the same level as beforeproject realization. Greenhouse gases emission reduction – 15 541t СО2/year Greenhouse gases emission reduction in a period from 2009 to 2012 – 46 623t СО2 Project realization costs - 11 322 thousand € Annual income from generated ERU sale– from116557,5 € to155 410 €

  11. JSC “Belshina” project ENERGY LARGE-SIZE TYRE PLANT COMPLEX RECONSTRACTION BASED ON CO-GENERATIONENERGOTECHNOLOGICAL INSTALATIONS Project realization costs -  5 493thousand € Greenhouse gases emission reduction – 27 761t СО2/year Greenhouse gases emission reduction in a period from 2009 to 2012 – 55 522 t СО2 Annual income from generated ERU sale– from208 207,5 € to 277 610 €

  12. JSC “Polotsk-Svetlovolokno” project GLASS-WORKED ARC №4 MODERNIZATION Implementation of electric heating additional system on existing direct-fire kiln for increasing arc efficiency. Project realization costs -  1 916thousand €(costs of 2006 ) Greenhouse gases emission reduction – 5 619t СО2/year Greenhouse gases emission reduction in a period from 2009 to 2012 – 11 238 t СО2 Carbon finance share (in a year) – from2,2%to 2,9%from project cost

  13. JSC “Grodno Azot” project 16 MW (2x8 MW) GAS TURBINE POWER PLANT CONSTRUCTION. SECOND PHASE Project realization costs - 24 800thousand € Greenhouse gases emission reduction – 10 915t СО2/year Greenhouse gases emission reduction in a period from 2010 to 2012 – 32 745t СО2 Annual income from generated ERU sale from81 862€to109 150€

  14. JSC “Grodno Azot” project NITROUS OXIDE GENERATION SUPPRESSION (N2O) As the result of project secondary decomposition catalyst installation in nitric acid production reactor at enterprise would be installed. Greenhouse gases emission reduction – 2009:238 253 tons СО2 2010: 235 745 tons СО2 2011: 233 237 tons СО2 2012:230 733 tons СО2 Greenhouse gases emission reduction in a period to 2012 – 937 968 t СО2 Project realization costs - 2 500thousand €(costs of 2006 ) Annual income from generated ERU sale from1,8 million € to 3,05 million €

  15. СО2emission reduction on the projects of 2007-2008

  16. СО2emission reduction on the projects of 2007-2008

  17. СО2emission reduction on the projects of 2009

  18. СО2emission reduction on the projects of 2009

  19. Our offers • Adoption and implementation of new power-efficient ecological technologies in realizable projects. • Application of the latest process plants of the institute in mining and chemical field in the projects implemented by our partners. • Application of the latest technologies of wind, solar energy, biogas and biomass usage in different projects. • Joint research activities aimed at the creation of new technologies in the field of power engineering and energy efficiency. • Joint implementation of projects within the framework of Kyoto protocol and the mechanism of voluntary greenhouse gas emission reduction. • Energy inspection and audit. • Protection of patent rights on the technologies and their usage. • Joint participation in European ecological programmes.

  20. Contact information JSC “Belgorkhimprom” 220029 Masherov avenue, 17 Telephone: (8017) 334-69-92 Fax: (8017) 334-70-25 E-mail: bmci@bmci.by Site: www.bmci.by The Ecological Monitoring Center Telephone: (8017) 334-79-88 E-mail: lgm@belgorhimprom.by

More Related