Engineering Practices Working Group (EPWOG)

Engineering Practices Working Group (EPWOG). EFCOG Executive Directors’ Meeting May 14-15, 2003 Status of EPWOG Formation and Motions Before the Board Tom Stevens, Framatome ANP. Engineering Practices Working Group (EPWOG). FORMATION: Organizational Efforts Authorized by EFCOG 25 Feb. ‘03

truda
Download Presentation

Engineering Practices Working Group (EPWOG)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Engineering Practices Working Group (EPWOG) EFCOG Executive Directors’ Meeting May 14-15, 2003 Status of EPWOG Formation and Motions Before the Board Tom Stevens, Framatome ANP

  2. Engineering Practices Working Group (EPWOG) • FORMATION: • Organizational Efforts Authorized by EFCOG 25 Feb. ‘03 • Organizational Meeting in Albuquerque 8 & 9 May ’03 • Organizational Meeting Attended by 15 Participants • Cross-section of the DOE Complex Represented • DOE Invited but Chose not to Attend • Results were Supportive of EPWOG and Agreement to Move Forward with Working Group Formation

  3. Engineering Practices Working Group (EPWOG) • COMPOSITION: • Interim Co-chairmen are Toney Mathews, Framatome, and Tobin Oruch, LANL • Membership is open to all EFCOG members • Membership Invitation to be Sent Out Following Briefing to EFCOG Executive Directors • DOE Executive Sponsor(s) will be Sought from NNSA and/or OECM (Willie Clark, NNSA, has expressed interest) • Tom Stevens is the Sponsoring Director • EPWOG assumes control of engineering standards, fire protection, and configuration management group activities

  4. Engineering Practices Working Group (EPWOG) • NEAR TERM ACTIONS of EPWOG: • Organizational Meeting Participants Brief Their Local Field Offices and Obtain Feedback and Support (All) • Identify the DOE Sponsor(s) (T. Mathews action) • Develop a Matrix of Functional Experts and Program Excellence (T. Oruch action) • Set Objectives to be Achieved by end of CY-2003 (Action deferred pending comment on initial list of issues to consider by the whole working group membership) • Hold Next Meeting in Washington, DC the week of October 20, 2003 (T. Mathews action)

  5. INITIAL LIST OF ISSUES FOR CONSIDERATION BY EPWOG: • Engineering Performance Metrics • Commissioning • Engineering, Project, Operations Transition • Integration of Safety Analysis Elements (Fire Protection, Criticality, Hazards Analysis, etc.) • Graded Approach Techniques (Nuclear and Non-nuclear) • Acquisition Methods for Outside Engineering Services • Conduct of Engineering (Best Practices) • Systems Engineer • Design Authority • Attract/Retain New Engineers • Challenge Existing Sub-Groups • Engineering Standards • Fire Protection • Configuration Management Engineering Practices Working Group (EPWOG)

  6. Engineering Practices Working Group (EPWOG) • MOTIONS: • The EFCOG Executive Directors approve the Engineering Practices Working Group Charter as duly presented to the Board in its regularly scheduled meeting on May 15, 2003. • The EFCOG Executive Directors authorize the re-designation of the Engineering Standards Working Group to be the Engineering Standards Sub-Group, under the control of the Engineering Practices Working Group. • The EFCOG Executive Directors authorize the continuance of a Fire Protection Task Group and a Configuration Management Sub-Group, and place them under the control of the Engineering Practices Working Group.