Coordination (R.C.) & UNDP Early Recovery Intervention and Livelihood Activities

ECHO. Coordination (R.C.) & UNDP Early Recovery Intervention and Livelihood Activities. Baalback & Hermel Caza - Lebanon Wednesday, September 19, 2007. Objectives. Establish a UNRC field presence Recovery activities Restore lives and Livelihoods

troy-lester
Download Presentation

Coordination (R.C.) & UNDP Early Recovery Intervention and Livelihood Activities

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ECHO Coordination (R.C.)& UNDP Early Recovery Intervention and Livelihood Activities Baalback & Hermel Caza - Lebanon Wednesday, September 19, 2007

  2. Objectives • Establish a UNRC field presence • Recovery activities • Restore lives and Livelihoods • Establishment of effective coordination mechanisms among various contributing bodies in the fields of recovery and development such as UN agencies and NGO’s • Provide technical support to local authorities

  3. Coordination and Sectorial Meetings • Coordination among local & International NGOs & local active institutions &CBOs • Identification of problems in each sector • Agriculture and environment sectors • Development and tourism sectors • Health and Education sector • Solutions and Priorities of intervention • How projects can address the following issues: • Feasibility • Sustainability • Avoid duplication • Number of beneficiaries

  4. Current status of the activities • Since its inception early November 2006 the UNDP Bekaa-Sub office carried out the following: • Initial preliminary inception meeting with local authorities and municipalities (Mohafez, Qa’im Maqam, Federation of Municipalities, Local Communities, Civil Society Organizations) • Needs and damage assessments in affected villages • Prioritize and supervise a variety of interventions to reconstruct and rehabilitate affected areas

  5. On-going Recovery Projects

  6. Baalbak /Al Sayel Road • Pavement • Lighting poles • Sewage Connections • Storm Water Canal • Landscaping

  7. Chmistar • Storm Water Canal

  8. Chwaghir • 1500 meters Irrigation Canal • 2 Bridges over the Assi River

  9. Hermel • Main entrance rehabilitation • Lighting poles • Pavements • Road Isles and signs • Retaining walls

  10. Completed Recovery Projects

  11. Bouday • Municipal Roof & Premises • Lighting poles • Generator • Irrigation Canals

  12. Nabi Shiit • Retaining walls • Lighting poles

  13. Al Saydeh • Main Bridge • Lighting Poles

  14. Al Ain • Retaining walls • Strom Water Drainage Canals • Drinking Water Network

  15. Younine • Lighting Poles • Retaining walls

  16. Haddath Baalback • Bridge • Retaining walls • Lighting poles

  17. Britel • Lighting poles • Retaining walls • Sewage Network

  18. Khraibeh • Lighting poles • Road Pavement • Retaining walls

  19. Zahleh – Civil Defense H.Q. • Well rehabilitation • Pump, pipes, electrical wires and accessories

  20. Field Assessment of Trout farms. • Damage assessment • Proposed farm design • Best management practices • Define levels of intervention & support: • Construction and rehabilitation of race ways (Ponds) • Technical support (shades, liners, demand feeders, air blowers, monitoring equipments) • Management –Trainings…etc • Provision of Alvins and fish feed

  21. Field Assessment of Trout farms.

  22. Forecasted livelihood projects in Northern Bekaa. • Union of Northern Baalbeck (Nabi-Othman): Market place for fruits vegetables and local products • Union of Baalbeck Municipalities (Baalbeck): Permanent Exhibition Hall • Union of Agriculture Cooperatives-Deir Al Ahmar: Cold storage Upgrading - Additional cold storage room (140 m2) • Union of Hermel Municipalities: Trout fish Processing, Smoking & Packaging plant • Union of East Baalbeck Municipalities (Nabi-Sheet): Municipal Equipments (Hydraulic Excavator, Cistern truck, Skid Steer Loader, Wheel loader) • Union of West Baalbeck Municipalities (Chmistar): Municipal Equipments (Hydraulic Excavator, Pick up broom, Skid Steer Loader, Wheel loader) • Union of Al Challal (Bouday): Municipal Equipments (Hydraulic Excavator, Pick up broom, Skid Steer Loader, Wheel loader)

  23. Areas of Intervention in Hermel Caza

  24. Areas of Intervention in Baalback Caza

  25. Thank You